Laserfiche WebLink
1. �� � �� <br /> � <br /> 3.0 CONCLUSIONS AND RECOMMENDATIONS <br /> � <br /> Based on conditions observed in the explorations, construction of the project appears feasible <br /> � using standazd conswction equiprci:nt and methods. Geotechnical conclusions and recommendations are <br /> presented for seismic consideration.;,site grading, foundation suppoR, floor slab support,and drainage. <br /> �_) . <br /> 3.1 SEISMIIC CONSIDERATIONS <br /> � The project site is lo�ated within seismic Zone 3 as defned by the 1997 Unifortn Duilding Code <br /> (UBC). The following values may be used in the UBC based analysis of earthquake loads: seismic zone <br /> � factor Z=0.30; soil profile type S�, seismic ccefficient C,= 0.45 and seismic coefficient C,= 0.33. The <br /> design response spectra may be computed based on Figure l63 in the UBC. <br /> l <br /> t <br /> 3.2 SITE GRADING <br /> , Site grading is expected to consist of removing existing asphalt, stripping vegetation and topsoil, <br /> excavating for new foundations, subgrade preparation for 800r slabs, exterior grade backfill, and utility <br /> � trench backfill. <br /> Asphalt is not suitable for reuse and should be wasted offsite at an approveci localion. <br /> lVegetation and topsoit should be stripped from the addition areas. Based on our field explorations, we <br /> , <br /> estimate the stripping depth to vary from Y: to 2 feet. The limits of stripping should extend at least 5 ft <br /> 1 beyond the buildirg footprint. Stripped matetial is considered unsuitable for reuse as fill, but may be <br /> stockpiled and reused in landscape areas. If not reused, the material should be wasted off site at an <br /> ' approved location. <br /> -� Field explocations completed in the area of the building additions revealed the presence of fill <br /> � which may be present below proposed foundation depth. Fill will not provide proper suppoR of <br /> foundations, but will provide adequate suppoR for slabon-grade floors if properly recompacted. <br /> 1 Excavations for foundations should be extended to suitable bearing scil. A geotechnical engineer should <br /> observe the Coundation excavation to check that suitable native soil is present. If fill or disturt�ed native <br /> i <br /> soil is exposed at foundation subgrade, it should be overexcavated to expose undisturbed native soil. The <br /> _; overexcavation should extend laterally outward from the edges of the footing a distance equal to at least <br /> one-half the depth of the overexcavation. Overexcavations should be bacY.filled with structural fill as <br /> ' recommended in Section 3.3 of this report. Based on conditions observed in test pits excavated in 1989, <br /> overexcavation depths are expected ro range from 0 to 2 fi. <br /> , <br /> ..J <br /> JSIlBN7 I�PROJECT10110D50101EA5TMONT RPTDOC 3-I L�wonuHs50cUi�s / <br />