My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9906 25TH DR SE 2016-01-01 MF Import
>
Address Records
>
25TH DR SE
>
9906
>
9906 25TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:56:37 PM
Creation date
4/1/2017 12:56:26 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH DR SE
Street Number
9906
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> PUBLIC WORKS PERMIT COMMENTS , <br /> 4. Contact the Public Works Inspector(call ) to discuss the project prior to beginning work. <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the dr:inage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof dovmspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing <br /> prior to beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, <br /> straw bales, swaies, or erosion blankets. <br /> 11. install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 13. AII excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is aliowed on this buiiding lot. <br /> 14. Nc dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15 No building materials to be stacked on sidewalk/roadway and sidewalklroadway to be kept clean <br /> and open for pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 <br /> I 306 on this proposal's frontage as directed by the Public Worhs Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 1 g. Pave driveway from the front property line out to the street paving. <br /> I 20. Contact the VVater Disirict for connecting prcvisions for this building's water <br /> and sewer services. <br />� 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required <br />;� forthe parking area. <br /> i <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.