My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9906 25TH DR SE 2016-01-01 MF Import
>
Address Records
>
25TH DR SE
>
9906
>
9906 25TH DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 12:56:37 PM
Creation date
4/1/2017 12:56:26 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH DR SE
Street Number
9906
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 7/21/2010 <br /> i <br /> �{:- Public Works Permit#: PW1007-012 <br /> Ciry of Everett Public Works Department Buildinq Permit#; 81007-025 <br /> a, � 3200 Cedar Street <br /> Everett, WA 98201 Planninp Reference#: � <br /> (425) 257-8810 <br /> Public Works Fee$: $ 25.00 <br /> O!her$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MONTILLA GREG <br /> 9906 25TH DR SE <br /> EVERETT WA 9820 <br /> PHONE: 4252255655 PHONE: <br /> TAX PARCEL ID# �8051700311200 SITE ADDRESS: 9906 25TH DR SE <br /> DESCRIPTION OF PROPOSED WORK: <br /> DETACHED ShOP <br /> PERMI'f CONDITIO�S <br /> 1. All calls for inspection shall be mada 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect rooftop downspuuts to the drainage system provided fo�this lot. - I-r_, <br /> 5. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site:: : �y <br /> No wastir,g of material is allowed on lhis building lot. -� ; a i..i <br /> 6. No dirt, mud, rocks or debris to be tracked onto roadway. - ;�_' -' V� <br /> 7. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for_ � <br /> pedestrian traveL _ O <br /> , <br /> Your inspector is Cliff Lindman, 425-339-7404 "' � �� <br /> �; � <br /> �r: .;., ,,"� <br /> r.•� � 0 <br /> - �a:n;.� <br /> . ,�..ri'._:cnni __ :-.� <br /> __�'_ <br /> ':i <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmiess the City of Everett from any and all claims for <br /> damages, costs,expenses,or causes oi action lhat may arise <br /> because of installation and maintenance of ihe improvement <br /> �/����� � Z��p or other right-of-way use he applied for and further agrees <br /> 6" to remove same upon noti irom the City and to replace <br /> Approved for Construction Date �i roperty damage ereby. <br /> /��� ��/__�__—� �C l>7� ���G �.f2' <br /> F NSPECTION Date <br /> Approved as Constructed � -�T��b Si ature of Ap licant Date <br /> WORK AUTHOFIZED BY THIS PERMlT MUST BE STARTED WITHIN '80 DA F PERPIIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLEfION. THIS PERMR MAY BE CANCELLED BY THE CITY UPON A�JY STOPPAGE OF WORK ON THIS PR.OJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.