My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3821 26TH PL 2016-01-01 MF Import
>
Address Records
>
26TH PL
>
3821
>
3821 26TH PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 1:38:49 PM
Creation date
4/1/2017 1:38:10 PM
Metadata
Fields
Template:
Address Document
Street Name
26TH PL
Street Number
3821
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. l � . <br /> ATTACFIMENT "A" II <br /> 1. Construction or substantial progress roward construction of a project must be �I <br /> undertaken wi[hin 2 years after final approval of the permit, and completed within j <br /> five years. If the project has not been completed in this time span the permit will � <br /> be reviewed by the Planning Deputment who will do one of following: extend the I <br /> permit for one year, or terminate the permit. <br /> 2. A landscape plan acceptable to the City of Everett Planning Department must be <br /> approved prior to issuance of building permits. ' <br /> 3. The first floor of structures and outdoor storage areas shall be two feet above the <br /> regulatory flood protection elevation. <br /> 4. The elevati�n of the site shall be two feet above the regulatory flood protection <br /> clevation for a distance of 15 feet beyond any structure in any directioe. <br /> , <br /> I <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.