My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEYEwuEUSER SIAITH ISLAND LANDFL <br />CLOSURE WROVEMENTS AND NHDES OUTFALL 006 ELMMATION <br />WA EINIFMANTA. CHECKLIST <br />The Snohomish County Shoreline Master Program and the Everett Shoreline Master Program both <br />designate the site as Urban. <br />h. Has any part of the site been classified as an "environmentally sensitive" area? If so, <br />specify. <br />As noted above, the site area is mapped as lying within the 100-year floodplain, although <br />the dike surrounding the landfill exceeds the 100-year flood elevation and therefore <br />removes the landfill from the 100-year floodplain. The City of Everett has designated Smith <br />Isiand, including the project site, as part of the "Snohomish Estuary Wetlands Integration <br />Program" (SEWIP). In addition, both the City and the County define the entire estuary <br />(including the site) as being within shoreline jurisdiction. <br />i. Approximately how many people would reside or work in the completed project? <br />No employees would be present on the site on a daily basis. Weyerhaeuser employees and <br />contractors will visit the site on a periodic basis to conduct groundwater monitoring and <br />maintenance activities. <br />j. Approximately how many people would the completed project displace? <br />None. <br />k. Proposed measures to avoid or reduce displacement impacts, if any: <br />Not applicable. <br />1. Proposed measures to ensure the proposal is compatible with existing and projected lane; <br />uses and plans, if any: <br />The proposed project is consistent with surrounling land uses, the current zoning <br />designation, and the Snohomish County and Everett Comprehersive Plans. <br />9. Housing <br />a. Approximately how many units would be provided, if any? Indicate whether high, <br />middle, or low-income housing. <br />Not applicable. <br />b. Approximately how many units, if any, would be eliminated? Indicate whether high, <br />middle, or low income housing. <br />Not applicable. <br />c. Proposed measures to reduce or control housing impacts, if any: <br />Not applicable. <br />10. Aesthetics <br />a. What is the tallest height of any proposed structure(s), not including antennas what is the <br />principal exterior building material(s) proposed? <br />The new stormwater lift station will extend a maximum of one foot above existing grade. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.