Laserfiche WebLink
WEYERHAEUSER COMPANY <br />SMITH ISLAND LANDFILL CLOSURE IMPROVEMENTS <br />AND NPDES OUTFALL 005 ELIMINATION <br />SEPA Environmental Checklist <br />A. BACKGROUND <br />1. Name of proposed project, if applicable: <br />Smith Island Landfill Closure Improvements and NPDES Outfall 005 Elimination <br />2. Name of applicant: <br />Weyerhaeuser Company (Weyerhaeuser) <br />3. Address and phone number of applicant and contact person: <br />Weyerhaeuser Company <br />PO Box 9777 <br />Federal Way, WA 98063-9777 <br />(253)924-2345 <br />Ms. Melody Sydow <br />Weyerhaeuser Company <br />Mail Sort EC2 2C1 <br />P.O. Box 9777 <br />Federal Way, Washington 98063-9777 <br />(253)924-6650 <br />4. Date checklist prepared: <br />March 2004 <br />5. Agency requesting checklist: <br />Snohomisli County Planning and Development Services <br />6. Proposed timing or schedule (including phasing, if applicable): <br />Smith Island Landfill Closure Improvements -Site Prepamdon will be conducted during <br />the summer of 2004 and the cover system improvements completed by the fall of 2005. <br />Outfall 005 Elimination- Construction will commence during the summer of 2004 and be <br />completed no later than March 1, 2005. <br />7. Do you have any plans for future additions, expansion, or further activity related to or <br />connected with this proposal? If yes, explain. <br />None, other than landfill post -closure maintenance required by Washington State Solid <br />Waste Regulations. <br />