My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEYERHAEUSER COMPANY <br />SMITH ISLAND LANDFILL CLOSURE IMPROVEMENTS <br />AND NPDES OUTFALL 005 ELIMINATION <br />SEPA Environmental Checklist <br />A. BACKGROUND <br />1. Name of proposed project, if applicable: <br />Smith Island Landfill Closure Improvements and NPDES Outfall 005 Elimination <br />2. Name of applicant: <br />Weyerhaeuser Company (Weyerhaeuser) <br />3. Address and phone number of applicant and contact person: <br />Weyerhaeuser Company <br />PO Box 9777 <br />Federal Way, WA 98063-9777 <br />(253)924-2345 <br />Ms. Melody Sydow <br />Weyerhaeuser Company <br />Mail Sort EC2 2C1 <br />P.O. Box 9777 <br />Federal Way, Washington 98063-9777 <br />(253)924-6650 <br />4. Date checklist prepared: <br />March 2004 <br />5. Agency requesting checklist: <br />Snohomisli County Planning and Development Services <br />6. Proposed timing or schedule (including phasing, if applicable): <br />Smith Island Landfill Closure Improvements -Site Prepamdon will be conducted during <br />the summer of 2004 and the cover system improvements completed by the fall of 2005. <br />Outfall 005 Elimination- Construction will commence during the summer of 2004 and be <br />completed no later than March 1, 2005. <br />7. Do you have any plans for future additions, expansion, or further activity related to or <br />connected with this proposal? If yes, explain. <br />None, other than landfill post -closure maintenance required by Washington State Solid <br />Waste Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.