My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEYERHAEUSER SIATTH ISLAND tANOFLI <br />CLOSURE WROVEIAENTS AND NPDES OUTFALL 006 RAIINATAN <br />SEPABA10N ENW.CHECKLIST <br />8. List any environmental information you know about that has been prepared, or will be <br />prepared, directly related to this proposal. <br />• Weyerhaeuser Company. Lift Station Design Report. including storm runoff calculations by <br />Weyerhaeuser (landfill area) and Hart Crowser (log sort yard). September 2003. <br />• CH2M HILL. Weyerhaeuser Company Smith Island Stomroater Lift Station Engineering Report. <br />Prepared for Weyerhaeuser. October 2003. <br />• CH2M HILL. Smith Island landfill Closure Plan Amendment (Draft). September 2003. <br />• CH2M HILL. Smith island Landfill Closure Improvements Engineering Report. Currently under <br />preparation <br />9. Do you know whether applications are pending for governmental approvals of other <br />proposals directly affecting the property covered by your proposal? If yes, explain. <br />No. <br />10. List any government approvals or permits that will be needed for your proposal, if known. <br />• National Pollution Discharge Elimination System (NPDES) Permit (Permit No WA- <br />003197-60) <br />• Snohomish County Shoreline Substantial Development Permit <br />• Snohomish County Critical Areas Review <br />• Snohomish County Grading Permit <br />• City of Everett Shoreline Substantial Development Permit <br />• City of Everett Grading Permit <br />11. Give brief, complete description of your proposal, including the proposed uses and the size <br />of the project and site. There are several questions later in this checklist that ask you to <br />describe certain aspects of your proposal. You do not need to repeat those answers on this <br />page. (Lead agencies may modify this form to include additional specific information on <br />project description.) <br />The Smith Island Landfill site is located on Smith Island in Snohomish County. Smith Island <br />is a distributary bar of the Snohomish River and is located on the north side of the main <br />channel of the Snohomish River between the cities of Everett and Marysville. The location <br />of the site is presented in Figure 1. The current layout of the site and the associated <br />wastewater treatment system are shown in Figure 2. The two proposed projects are <br />described below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.