Laserfiche WebLink
SCHEDULE B: SM1 ! ISLAND LANDFILL 177065B <br />PHASE 2 CLOSURE IMPROVEMENTS <br />SECTION 02370 <br />SOIL STABILIZATION <br />PART1 GENERAL <br />1.1 DEFINITIONS <br />A. Maintenance Period: Begin maintenanceimmediately after each area is <br />planted and continue for a period of S weeks after all planting under this <br />section is completed. <br />B. Satisfactory Stand: Grass or section of grass that has: <br />1. No bare spots larger than 3 square feet. <br />2. Not more than 10 percent of total area with bare spots larger than <br />1 square foot. <br />3. Not more 'han 15 percent of total area with bare spots larger than <br />6 square inches. <br />1.2 SUBMITTALS <br />A. Action Submittals: Product data fn- commercial products. <br />B. Informational Submittals: <br />1. Construction Period Drainage and Erosion/Sedimentation Control Plan <br />and Procedures. <br />2. Manufacturer's Installation Instructions: Commercial products. <br />3. Seed certifications. <br />4. Copies of delivery invoices or other proof of quantities of mulch and <br />fertilizer. <br />1.3 DELIVERY, STORAGE, AND PROTECTION <br />A. Seed: <br />1. Furnish in standard containers vith seed name, lot number, net weight, <br />percentages of purity, germination, and hard seed and maximum weed <br />seed content, clearly marked for each comainer cf seed. <br />2. Keep dry during storage. <br />B. Hydroseeding Mulch: Mark package of wood fiber mulch to show air dry <br />weight. <br />SEA/177065.A7.19 JULY 16, 2004 <br />02370 1 SOIL STABILIZATION <br />