My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE B: SMk 'ISLAND LANDFILL 177065B <br />PHASE 2 CLOSURE IMPROVEMENTS <br />3.9 ACCEPTANCE TESTING <br />A. Contractor shall perform in -place density and moisture content tests as <br />specified in Section 02316, Fill and Backf ill, to be observed by the Owner's <br />Representative, on the following minimum schedule: <br />1. Backfill Above Pipe Zone (Non -Waste Trench): One per 500 linear feet <br />per lift. <br />2. Seepage Barrier: One per lift. <br />3.10 MAINTENANCE OF TRENCH BACKFILL <br />A. After each section of trench is backfilled, maintain the surface of the <br />backfilled trench even with the adjacent ground surface until final surface <br />restoration is completed. <br />B. Add excavated material where applicable and keep the surface of the <br />backfilled trench level with the adjacent ground surface. <br />END OF SECTION <br />SEA/177065.A7.19 JULY 16, 2004 <br />02320 5 TRENCH BACKFILL <br />
The URL can be used to link to this page
Your browser does not support the video tag.