My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2018-01-02 MF Import
>
Address Records
>
32ND AVE NE
>
2725
>
2725 32ND AVE NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 1:33:59 PM
Creation date
4/1/2017 2:46:40 PM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE B: SM1 i ISLAND LANDFILL. <br />PHASE 2 CLOSURE IMPROVEMENTS <br />177065B <br />3.6 SOIL STOCKPILES <br />A. Protect from erosion with geotextile and support fence. <br />3.7 STRAW BALES <br />A. Embed minimum of 4 inches in flat-bottomed trench. <br />B. Place with ends tightly abutting or overlapped. Comer abutment is not <br />acceptable. <br />C. Install so that bale bindings are oriented around the sides and not aver ithe top <br />and bottom of the bale. <br />D. Use two posts for each bale. Drive posts through the bale until top of post is <br />flush with top of bale. <br />E. Wedge loose straws in any gaps between bales. <br />3.8 FIELD QUALITY CONTROL <br />A. Upon completion of maintenance period and on written notice from <br />Contractor, Engincer will within 15 days of receipt, determine if a satisfactory <br />stand has been established. <br />B. If a satisfactory stand has not been established, Engineer will make another <br />determination upon written notice from Contractor following the next growing <br />season. <br />END OF SECTION <br />SEA/177065.A7.19 JULY 16, 2004 <br />02370 7 SOIL STABILIZATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.