Laserfiche WebLink
SCHEDULE B: SMIt � ISLAND LANDFILL ` 177065B <br />PHASE 2 CLOSURE IMPROVEMENTS <br />SECTION 02632 <br />STORM DRAIN PIPING <br />PART1 GENERAL <br />1.1 WORK INCLUDED <br />A. This section covers the work necessa. r to furnish and install outlet pipe and <br />culverts. <br />1.2 SUBMITTALS <br />A. Informational Submittals: Catalog information for stormwater pipe and <br />fittings. <br />1.3 DEFINITIONS <br />A. Standard Specifications: When referenced in this section, shall mean Standard <br />Specifications for Road, Bridge and Municipal Construction, as published by <br />the Washington State Department of Transportation, 2004 edition, English <br />units. <br />1.4 GENERAL <br />A. All pipe sizes shown on the Drawings and specified here arc "nominal" <br />diameter, unless otherwise indicated. <br />1.5 SAFETY <br />A. Perform all work in accordance with local, state, and federal safety <br />requirements. <br />PART PRODUCTS <br />2.1 CORRUGATED POLYETHYLENE (CPE) PIPE <br />A. Pipe and fittings as specified in Data Sheet following 'End of Section." <br />2.2 JOINTS <br />A. Use rubber gasket joints for the CPE pipe. <br />SEA/177065.A7.19 JULY 16, 2004 <br />02632 1 STORM DRAIN PIPING <br />