Laserfiche WebLink
SCHEDULE B: SM1 : ISLAND LANDFILL <br />PHASE 2 CLOSURE IMPROVEMENTS <br />177065B <br />3.4 LEAK TESTING <br />A. CPE Pipe: Testing shall be in accordance with the requirements of <br />Section 7-04 of the Standard Specifications. <br />3.5 SUPPLEMENTS <br />A. Data Sheets: <br />Number <br />M <br />SEA/177065.A7.19 <br />02632 <br />Title <br />Corrugated Polyethylene <br />END OF SECTION <br />JULY 16, 2004 <br />STORM DRAIN PIPING <br />