Laserfiche WebLink
SECTION 01110 <br />SUMMARY OF WORK <br />2. Temporary Erosion and Sediment Control <br />3. Rough and Finish Site Grading <br />4. Concrete Curbs and Gutters <br />5. Passenger Platforms and Commuter Rail and Amtrak coordination with BNSF. <br />6. Site Storm Drainage and Utilities <br />7. Asphalt Paving (parking lot) <br />8. Concrete Paving (sidewalks and driveways). <br />9. Flagstone and Unit Stone Paving and Granite strip. <br />10. Tactile Warning tile <br />11. Parking and Platform Pavement Marking and Signing <br />12. Rail and Related Storm Drainage Construction <br />13. Also i eluded in this scope are the street improvements to Hill Avenue and 33rd Street. <br />C. Site Lighting and Underground Site Electrical Distribution. <br />D. Landscaping. <br />1. Topsoil and Amendments <br />2. Plant Materials, including Trees, Shrubs, Ground Covers and Turf. <br />3. Gravel and Crushed Stone Paving <br />4. Edging <br />E. Landscape Irrigation System. <br />F. Site Furnishings, including Stone Bench, Pre -manufactured Benches, Trash Receptacles <br />Bicycle Lockers and Racks, Tree Grates, and Trench Drains. <br />G. Ornamental and Chain Link Fences and Gates. <br />H. Art Work consisting of (5) granite stone pieces installed on the site. <br />I. Integrated Work. <br />1. PROVISIONS FOR EVERETT LAYOVER FACILITY EXPANSION scope of work under <br />Capital Projects Commuter Rail 01110 - 2 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK <br />W <br />1.k. <br />