Laserfiche WebLink
SECTION 01110 <br />SUMMARY OF WORK <br />this subsection will be in accordance with drawings CA-09, in addition to the rest of the <br />contract documents, and includes a) through g) and all other associated requirements. <br />a) Sanitary Sewer Main and lateral for future toilet dump. <br />b) Sanitary Sewer flushing manhole and Control Valve Box Chamber. <br />c) Flushing Manhole Control Panel Foundation. <br />d) Water line for future layover facility. <br />e) Air compressor line. <br />f) Electrical ductbank, conduits and electrical pull boxes. <br />g) And all other associated requirements as shown on drawings CA-09. <br />1.02 LOCATION <br />A. The Work area is located in Everett, Washington. The project is located at 3232 Hill <br />Avenue. The project site is bounded by Hill Avenue on the East, 33r° Street on the South, <br />BNSF Railway on the West and Pacific Avenue on the North. <br />1.03 PROJECT LOGISTICS <br />A. The Contractor shall access the construction site on and off using the routes shown on the <br />drawings. <br />The contractor may periodically be required to stage construction operations off Pacific <br />Avenue. Construction work in this area must be reviewed, coordinated and approved by <br />Sound Transit's Resident Engineer, as well as the City of Everett. <br />1.04 CONTINUITY OF FACILITIES <br />A. Existing City of Fderett, County of Snohomish utilities, streets and facilities, except as <br />indicated in the Contract Documents, will remain in operation throughout performance of the <br />Work. Shutdowns of such utilities, streets and facilities and interference with normal <br />operations and maintenance is prohibited without written authorization from City of Everett <br />and/or Snohomish County PUD. <br />1.05 CCNTRACTOR'S USE OF PREMISES <br />A. It is assumed that existing facilities outside the scope of the Work are in good repair. <br />Damage or defects noticed by the Contractor shall be reported to the resident engineer <br />immediately and prior to the start of Work. Damage caused by the Contractor shall be <br />repaired and/or replaced to a condition equal to or better than that existing prior to the <br />damage, at no additional cost to Sound Transit. <br />B. Community Relations <br />Capital Projects Commuter Rail 01110 - 3 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK <br />