My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01110 <br />SUMMARY OF WORK <br />Two weeks prior to beginning of a specific construction activity, the Contractor shall <br />prepare a narrative of proposed construction activities, including a schedule, to Sound <br />Transit Facility. Specifically, the following information shall be provided += <br />a.) Identify the dates by which construction activity, which has the following effects, <br />will commence and be finished <br />i. Disrupt normal traffic Flow on Hill Avenue, 33'tl Street, Smith Avenue or <br />Pacific Avenue. <br />ii. Disrupt access, vehicular or pedestrian, to any active business or transit <br />adjacent to the Site. <br />iii. Restrict parking on any street within or adjacent to the Site. <br />iv. Require work outside of normal work hours. <br />2. Sound Transit's Resident Engineer will be responsible for issuing advance notification <br />to the public at large. However the Contractor shall be responsible for the day-to-day <br />or hour -by -hour coordination with local governmental authorities, property owners or <br />tenants when Work directly impacts normal operations, uses, or accesses. <br />Contractor's failure to meet minimum notification requirements shall not result in <br />additional cost to Sound Transit. <br />1.06 SURVEY INFORMATION <br />A. A survey of the site is provided by Sound Transit and included in the Drawings. Sound <br />Transit has established reference benchmarks identified on the Drawings. The Contractor <br />will confirm with Sound Transit the reference survey data at the start of construction. From <br />the information provided, the Contractor shall develop and make such additional surveys as <br />are needed for construction, such as control lines, slope stakes, settlement platforms, batter <br />boards, stakes for pipe locations and other working points, lines and elevations. Survey <br />work shall be performed under the responsible charge of a State of Washington licensed <br />land surveyor. The Contractor shall re-establish reference benchmarks and survey control <br />monuments destroyed by its operations at no cost to Sound Transit. Submit control work <br />and cut sheet to the Resident Engineer in advance of work operations. <br />1.07 SPECIFICATION LANGUAGE <br />A. Portions of the Specifications are written in imperative and streamlined form. This <br />imperative language is directed to the Contractor, unless specifically noted otherwise. The <br />words "shall be" shall be included by inference where a colon () is used within sentences or <br />phrases. <br />1. Examples: <br />a.) Aggregate: ASTM C33 <br />b.) Adhesive: Spread with notched trowel <br />Capital Projects Commuter Rail 01110 - 4 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.