My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />CONTRACTOR REQUIREMENTS <br />1.01 General <br />FORM APPROVED <br />BY VP -LAW <br />• 1.01.01 The Contractor must cooperate with THE BURLINGTON NORTHERN AND SANTA FE <br />RAILWAY COMPANY, hereinafter referred to as "Railway" where work is over or under on or adjacent to <br />Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of <br />Sounder Commuter Rail Everett Station Phase 2. <br />• 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit "C-l" <br />Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and <br />effect the insurance called for under Section 2 of said Exhibit "C-I". <br />• 1.01.0J The Contractor must plan, schedule and conduct all work activities so as not to interfere with the <br />movement of any trains on Railway Property. <br />• 1.01.04 The Contractor's right to enter Railway's Property is subject to the absolute right of Railway to cause <br />the Contractor's work on Railways Properly to cease if, in the opinion of Railway, Contractor's activities create <br />a hazard to Railway's Property, employees, and/or operations. <br />• 1.01.05 The Contractor is responsible for determining and complying with all Federal, Slate and Local <br />Governmental laws and regulations, including, but not limited to environmental laws and regulations (including <br />but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil <br />Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health and safety laws and <br />regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all <br />fines or penalties imposed o. assessed by Federal, Slate and Local Governmental Agencies against the Railway <br />which arise out of Contractor's work under this Agreement. <br />• 1.01.06 The Contractor must notify the Sound Transit at (206)398-5079 and Railway's Manager Public Projects, <br />telephone number (206) 625-6146 a1 least thirty (30) working days before commencing any work on Railway <br />Property. Contractor's notification to Railway, must refer to Railroad's file number to be determined._ <br />1.01.07 For any falsework above any tracks or any excavations located, whichever is greater, within <br />twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of mil on a I %n <br />horizontal to I vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured <br />perpendicular to center line of track, the Contractor must famish the Railway five sets of working drawings <br />showing details of construction affecting Railway Property and tracks. The working drawing must include the <br />proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract <br />plans and two sets of structural calculations of any fdsework, shoring or cribbing. All calculations must take <br />into consideration railway surcharge loading and must be designed to meet American Railway Engineering and <br />Maintenance -of -Way Association (previously known as American Railway Engineering Association) Coopers <br />E-80 live loading standard. All drawings and calculations must be stamped by a registered professional engineer <br />licensed to practice in the state the project is located. The Contractor must not begin work until notified by the <br />Railway that plans have been approved. The Contractor will be required to use lilting devices such as, cranes <br />and/or winches to place or to remove any falsework over Railway's tracks. In no case will the Contractor be <br />relieved of responsibility for results obtained by the implementation of said approved plans. <br />Capital Projects Commuter Rail I <br />Everett Station Phase 2 EXHIBIT "C" <br />CONTRACTOR REQUIRMENTS <br />IFB No. RTA/CP 21-06 <br />Form 0102 Rev.02/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.