My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />PART1-GENERAL <br />1.01 SUMMARY <br />A. This Section includes measurement and payment procedures to be followed by the <br />Contractor. These procedures include, but are not limited to the following: <br />1. Required Submittals <br />2. Preparation of Applications for Payment <br />3. 11.ubmittal Procedures <br />4. 'Jayment for Stored Materials <br />5. Substantiating Data <br />6. Payment for Unit Price Bid Items <br />7. Measurement <br />8. Payment for Initial Mobilization <br />1.02 REQUIRED SUBMITTALS <br />A. Submittals: <br />Submittals shall be made in accordance with the requirements of Section 01330 — <br />Submittals and as specified herein. <br />2. For any lump sum bid items, a Schedule of Values shall be developed by the <br />Contractor and submitted to the Resident Engineer for approval after Notice to <br />Proceed, but prior to the first progress payment request. <br />a) The Contractor shall submit a complete cost breakdown of any lump sum bid items, <br />whether for the entire contract or not, showing the value assigned to each part of <br />the work (activity), including allowance for overhead and profit. <br />b) The Schedule of Values shalt show the sequence in whicli Contractor proposes to <br />perform the Work, all completion dates and critical dates ir'dicated in the Contract <br />Documents, and the dates on which the Contractor plans to start and finish major <br />portions of the Work. The Schedule of Values shall be linked to the CPM Progress <br />Schedule, as specified in Section NETWORK ANALYSIS SCHEDULES, and the <br />activities and durations of the Schedule of Values shall be hammocks (summaries) <br />:;f the more detailed activities in the CPM Progress Schedule. The Contractor shall <br />include enough activities in the Schedule of Values so that all significant portions of <br />the Work, critical interfaces, coordination with Sound Transit and milestone and <br />completion dates are addressed. <br />Capital Projects Commuter Rail 01200 - 1 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.