My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />2. Payment <br />a) All work to perform the roadway and site excavation and embankment <br />compaction with reuse of available on -site material to shape the existing material to <br />design grades shall be included in the project lump sum item. <br />b) "Gravel "orrow Incl. Haul', per ton. <br />The unit contract price per ton for "Gravel Borrow Incl. Haul' shall be full compensation <br />for all costs incurred for furnishing, hauling, placing, and compacting the material. <br />c) "Unsuitable Foundation Excavation Incl. Haut — Contaminated", per ton. <br />d) "Unsuitable Foundation Excavation Incl. Haul — Uncontaminated", per ton. <br />e) The unit contract price per ton for "Unsuitable Foundation Excavation Incl. Haul — <br />Contaminated" and "Unsuitable Foundation Excavation Incl. Haul — Uncontaminated" <br />shall be full payment for all costs incurred for excavating, stockpiling and testing as <br />directed by the Resident Engineer, !oading, hauling, and disposing of the material. <br />f) There will be no separate payment for haul on any material moved within or from <br />the project site and the Contractor shall include the cost of hauling in the contract price. <br />C. RCW 39.04.180 requires that a separate bid item for shoring or extra excavations be <br />included in the estimate and proposal. In no case shall the costs for shoring or extra <br />excavations be included in other bid items. <br />"Trench Excavation Safety Systems", per lump sum. <br />In the !ump sum contract price for "Trench Excavation Safety Systems" shall be full <br />pay for performing the work as specified in Section 2-09, Shoring or Extra <br />Excavation Calss , of the Standard Specifications. <br />1.08 MEASUREMENT <br />A. Measurement and payment descriptions for each item listed in the Bid Form are as <br />set forth throughout the applicable sections of the Contract Documents and as <br />noted herein. <br />1. All bid items of work acceptably completed under the Contract will be measured by the <br />Resident Engineer according to United States standard measure. <br />2. Measurements will be made as hereinafter provided unless otherwise provided for by <br />their individual measurement specifications. <br />3. The method of measurement and computations to be used in determination of quantities <br />of material furnished or of work performed under the Contract will be those methods <br />generally recognized as conforming to accepted engineering practice and will be carried <br />to the proper significant figures or fractions of units for each item to conform to the usual <br />practice of Sound Transit. <br />4. Items of work for which payment is made by a 'Lump Sum" will be measured as a <br />complete unit. Partial payment, if made, will be made according to the completed <br />percentage of the various components of the lump sum item detailed in an approved <br />Schedule of Values, except for bid item "Initial Mobilization" if listed in the Bid Form. <br />Measurement for payment for bid item 'Initial Mobilization" will be based upon completion <br />of all such work, as specified, as a single, lump sum, non-proratable pay item. <br />Capital Projects Commuter Rail 01200 - 5 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.