My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />1. Notarized certification of payment from supplier. <br />2. Copy of canceled check to supplier. <br />3. Lien release from supplier. <br />C. Stored material items may be included in monthly application for payment only after <br />drawings and data submittals, if any are required, have been completed per <br />Contract Documents. <br />D. The Contractor shall demonstrate that the costs of materials have been paid and <br />will establish Sound Transit's title to such materials or equipment or otherwise <br />protect Sound Transit's interest including applicable insurance and transportation <br />for those items stored off -site. <br />E. Partial payment for materials and equipment in advance of installation shall not <br />constitute acceptance thereof and will not relieve Contractor of full responsibility for <br />condition and subsequent acceptance by Sound Transit. Faulty materials <br />discovered will be rejected even though partial payment may have been made. <br />1.06 SUBSTANTIATING DATA <br />A. When Sound Transit requires substantiating information, submit data within seven <br />(7) calendar days of request justifying line item amounts in question. <br />1.07 PAYMENT FOR UNIT PRICE BID ITEMS <br />A. Any unit prices listed in the Bid Form are complete including labor, plant, <br />equipment, products, fees, and any incidental charges; and including allowance for <br />overhead and profit. Unit prices are not for work required by the Drawings and <br />Specifications that are to be stated as a lump sum in the Base Bid. <br />The following unit price items are included to pay for the uncertain quantities that <br />may be involved due to material contamination. The work is defined in Section <br />01900, Attachment A, Roadway and Site Excavation and Embankment. <br />Measurement <br />a) Roadway and site excavation and embankment compacP::n with reuse of <br />available on -site material to shape the existing material to design grades will not be <br />measured. <br />b) Gravel borrow will be measured by the ton. <br />c) Unsuitable foundation excavation including haul of uncontaminated material will <br />be measured by the ton. <br />d) Unsuitable foundation excavation including haul of contaminated material will be <br />measured by the ton. <br />e) Testing of the material per disposal site requirements will not be measured. <br />Capital Projects Commuter Rail 01200 - 4 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.