Laserfiche WebLink
SECTION 01200 <br />MEASUREMENT AND PAYMENT PROCEDURES <br />1. Notarized certification of payment from supplier. <br />2. Copy of canceled check to supplier. <br />3. Lien release from supplier. <br />C. Stored material items may be included in monthly application for payment only after <br />drawings and data submittals, if any are required, have been completed per <br />Contract Documents. <br />D. The Contractor shall demonstrate that the costs of materials have been paid and <br />will establish Sound Transit's title to such materials or equipment or otherwise <br />protect Sound Transit's interest including applicable insurance and transportation <br />for those items stored off -site. <br />E. Partial payment for materials and equipment in advance of installation shall not <br />constitute acceptance thereof and will not relieve Contractor of full responsibility for <br />condition and subsequent acceptance by Sound Transit. Faulty materials <br />discovered will be rejected even though partial payment may have been made. <br />1.06 SUBSTANTIATING DATA <br />A. When Sound Transit requires substantiating information, submit data within seven <br />(7) calendar days of request justifying line item amounts in question. <br />1.07 PAYMENT FOR UNIT PRICE BID ITEMS <br />A. Any unit prices listed in the Bid Form are complete including labor, plant, <br />equipment, products, fees, and any incidental charges; and including allowance for <br />overhead and profit. Unit prices are not for work required by the Drawings and <br />Specifications that are to be stated as a lump sum in the Base Bid. <br />The following unit price items are included to pay for the uncertain quantities that <br />may be involved due to material contamination. The work is defined in Section <br />01900, Attachment A, Roadway and Site Excavation and Embankment. <br />Measurement <br />a) Roadway and site excavation and embankment compacP::n with reuse of <br />available on -site material to shape the existing material to design grades will not be <br />measured. <br />b) Gravel borrow will be measured by the ton. <br />c) Unsuitable foundation excavation including haul of uncontaminated material will <br />be measured by the ton. <br />d) Unsuitable foundation excavation including haul of contaminated material will be <br />measured by the ton. <br />e) Testing of the material per disposal site requirements will not be measured. <br />Capital Projects Commuter Rail 01200 - 4 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 MEASUREMENT AND PAYMENT PROCEDURES <br />