My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br />PROJECT MEETINGS <br />PART 1- GENERAL <br />1.01 SUMMARY <br />A. This Section identifies the responsibilities of the Contractor and Owner's Representatives <br />regarding project meetings during construction. These responsibilities include, but are not <br />limited to, the following: <br />1. Description <br />2. Authority Designation <br />3. Submittals <br />4. Agenda <br />5. Pre -installation Conferences <br />6. Minutes <br />1.02 RELATED REQUIREMENTS SPECIFIED ELSEWHERE <br />A. Make particular reference to the following specification sections: <br />1. Section 01308 — Conlsactor's Project Organization. <br />2. Section 01311 — Project Coordination. <br />3. Section 01323 — Network Analysis Schedules. <br />4. Section 01336 — Submittals. <br />5. Section 01400 — Quality Control. <br />1.03 DESCRIPTION <br />A. Work included: <br />1. In general, project meetings will be held w, ;kly at the job site in accordance with a <br />mutua!ly acceptable schedule. The Resident Engineer will conduct project meetings <br />throughout the construction period. <br />2. The purpose of the project meetings is to enable orderly review of progress during <br />construction and to provide for syster.-atic discussion and analysis of problems that <br />might arise between Sound Transit, and Designer, and/or Contractor relative to <br />execution of the Work. <br />3. Special meetings called at the discretion of the Resident Engineer. <br />B. Related work described elsewhere: <br />Capital Projects Commuter Rail 01310 - 1 <br />Everett Station Phase 2 PROJECT MEETINGS <br />IFB No. RTA/CP 21-06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.