My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01311 <br />PROJECT COORDINATION <br />PART 1 — GENERAL <br />1.01 DESCRIPTION OF WORK <br />A. Contractor shall perform the following Project Coordination Requirements <br />1. Coordinate the Work of all Subcontractors with the Work of the Contractor <br />a.) Distribute information and coordinate necessary action of subcontractors and <br />suppliers in response to information and direction provided by Sound Transit (i.e., <br />Requests for Information, Requests for Proposal, executed Change Orders, etc.) <br />b.) For temporary utilities. <br />c.) Among the Work of the trades specified in Divisions 2 through 16 and the work <br />modified from the Standard Plans and Specifications covered in Section 01900. <br />d.) Ensure that notification to and inspections by permitting agencies are completed <br />in a timely manner. <br />2. Coordinate the schedules of all subcontractors to: <br />a.) Verify timely deliveries of products for installation by other trades <br />b.) Verify that labor and materials are adequate to maintain schedules <br />3. Conduct conferences among all subcontractors, and other concerned partie';, as <br />necessary to: <br />a.) Maintain coordination and schedules <br />b.) Resolve matters in dispute <br />c.) Coordinate utility outages <br />4. Participate in Project meetings <br />a.) As required by these specifications <br />b.) Report progress of the Work <br />c.) Recommend needed changes in schedules <br />d.) Transmit minutes of meetings to all other trades, as appropriate <br />5. Temporary Utilities Required During Construction <br />Capital Projects Commuter Rail 01311 - 1 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 PROJECT COORDINATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.