Laserfiche WebLink
SECTION 01311 <br />PROJECT COORDINATION <br />b.) Coordinate the requirements of Section 01810 —Commissioning. <br />14. Pre- Final Inspection <br />a.) Prior to inspection, check that equipment is clean, repainted as required, tested <br />and operational and that the Contractor's Pre -Final punch list is preparers and <br />delivered to the Resident Engineer. <br />b.) Assist Resident Engineer; prepare consolidated list of items to be completed or <br />corrected after inspection. <br />15. Assemble Record Document information from subcontractors, incorporate into <br />Contractor's Record Documents, and ensure that completed record documents are <br />submitted to the Resident Engineer in accordance with Section 01729 — Project Record <br />Documents. <br />PART 2 — PRODUCTS <br />Not Used <br />PART 3 — EXECUTION <br />Not Used <br />END OF SECTION 01311 <br />Capital Projects Commuter Rail 01311 - 3 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 PROJECT COORDINATION <br />