My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01330 <br />SUBMITTALS <br />PART 1 — GENERAL <br />1.01 RELATED WORK DESCRIBED ELSEWHERE: <br />A. Contractual requirements for submittals: <br />1. General Provisions. <br />2. Section 01311 — Project Coordination. <br />3. Section 01729 — Project Record Documents. <br />4. Section 01785 — Operations and Maintenance Data. <br />B. Individual submittals required in accordance with the pertinent sections of these <br />specifications. <br />1.02 GENERAL <br />A. Submittal Log: After award, the Contractor will provide the draft Submittal Log to Resider. <br />Engineer indicating the submittals required by the specifications. Resident Engineer will <br />check the Submittal Log for completeness and accuracy against the specific plans and <br />return an original of the Submittal Log to the Contractor within fifteen (15) calendar days. <br />The Contractor shall provide a final Submittal Log to the Resident Engineer within seven (7) <br />calendar days of the Resident Engineer's revisions. <br />All submittals shall bear the contract name and number, the date or submission, reference to <br />the specification section and drawing number to which the submittal applies, the nature of <br />the submittal, and the Contractor's signature indicating the submittal is in conformance with <br />all contract provisions. <br />C. Submit all shop drawings, catalog cuts, brochures and mailable samples in the quantity <br />specified herein accompanied with a "Shop Drawing Multi -Transmittal" form. Forms will be <br />supplied by the Resident Engineer <br />D. Prepare a separate submittal form for each product or procedure and identify by referencing <br />the specification section and paragraph number. A minimum of eight (8) copies of each <br />submittal will be required, unless explicitly specified otherwise. <br />E. Sound Transit will return a minimum of one (1) copy of each submittal to the Contractor <br />within twenty-one (21), calendar days of receipt by the Resident Engineer, unless explicitly <br />specified otherwise. <br />The Resident Engineer shall receive submittals, including shop drawings, product data and <br />samples from Contractor and shall review and take other appropriate action on them, but <br />only for conformance with the design concept of the Project and within the provisions and <br />intent of the Contract Documents. Shop drawings, samples, and other submission reviews <br />by the Resident Engineer shall not include checking of dimensions or openings for potential <br />conflict. The Resident Engineer's acceptance of a specific item shall not indicate <br />acceptance of an assembly of which the item is a component. Submittals will be returned <br />Capital Projects Commuter Rail 01330 - 1 <br />Everett Station Phase 2 SUBMITTALS <br />IFB No. R—i,%'rP 21-06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.