Laserfiche WebLink
SECTION 01330 <br />SUBMITTALS <br />"No Exception Taken," "Approved as Noted," "Amend and Resubmit," "Rejected," or <br />"Reviewed for Information Only". <br />G. See General Provisions for additional requirements regarding requests for substitutions. <br />H. All submittals must be received by the Resident Engineer with adequate time for receipt, <br />review, comment, and return to the Contractor prior to corresponding scheduled construction <br />and/or to corresponding contract milestone. <br />1.03 SHOP DRAWINGS <br />A. Quality: Prepare shop drawings accurately to scale sufficiently large to indicate all pertinent <br />features of the products and the method of fabrication, connection, erection, or :,ssembly <br />with respect to the Work. Calculations associated with shop drawing d Fi;n shall also be <br />submitted. <br />B. Structural Fabrication and Erection Drawings: All shop drawings which indicate structural <br />fabrication or erection details and associated calculations shall bear the seal of a Structural <br />Engineer licensed in the State of Washington. <br />C. All drawings submitted to the Resident Engineer shall be drawn on individual sheets 24 <br />inches wide by 36 inches long in overall dimensions or on small sheets that are multiples of <br />8-1/2 inches by 11 inches. <br />D. Type of Prints Required: Submit one (1) reproducible and seven (7) copies of all shop <br />drawings or supplemental working drawings. <br />1.04 MANUFACTURERS' LITERATURE <br />A. Submit one (1) reproducible (original) and six (6) copies of manufacturers' literature. <br />B. Product data, catalog cuts, or brochures shall show the type, size ratings, style, color. <br />manufacturer and catalog number of each item and be complete enough to provide for <br />positive and rapid identification in the field. Submit catalog data in an orderly bound form. <br />Specific items shall be clearly marked. General catalogs or partial lists will not be accepted. <br />1.05 SAMPLES <br />A. The sample submitted shall be the exact or precise article proposed to be furnished. <br />B. Submit two (2) samples of each article proposed. <br />1.06 OPERATIONS AND MAINTENANCE DATA <br />A. See Requirements in Section 01785, Operations and Maintenance Data. <br />1.07 SUBSTITUTIONS <br />A. Comply with the requirements of the General Provisions. <br />Capital Projects Commuter Rail 01330 - 2 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 SUBMITTALS <br />