Laserfiche WebLink
SECTION 01330 <br />SUBMITTALS <br />4. Methods of: discharging residua! fluids from lines and equipment; valve sequencing; <br />electrical load shedding for deactivating and reactivating service lines, equipment and <br />the sy::!am reactivation procedure. <br />5. Incorporation of the specific deactivation and reactivation requirements of the relevant <br />technical specifications. <br />6. Compliance with safety standards. <br />7. Coordination required with Sound Transit, the City, or other utility owners. <br />C. It is the Contractor's responsibility to fully understand and verify the condition of any utility <br />service lines, and equipment at all times during the course of the work. The Contractor shall <br />be responsible for all damages resulting from his actions. <br />PART 2 — PRODUCTS <br />Not Used <br />PART 3 — EXECUTION <br />Not Used <br />END OF SECTION 01330 <br />Capital Projects Commuter Rail 01330-4 IFB No. RfA/CP 21-06 <br />Everett Station Phase 2 SUBMITTALS <br />