My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
2400 33RD ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 11:55:02 AM
Creation date
4/1/2017 3:28:41 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Notes
FOR EVERETT STATION SEE 3201 SMITH ST
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01400 <br />QUALITY CONTROL <br />D. Concrete Formwork <br />Inspect forms for location, configuralir.n, camber, shoring, sealing of form joints, <br />correct forming material, concrete accessories, and form locations. Contractor shall <br />provide the inspector with a copy of the approved formwork/shoring shop drawings. <br />E. Reinforcing Steel <br />All steel bars must be positively identified as o hear number and mill analysis. <br />a. All steel bars that cannot be identified by heat number and mill analysis <br />shall have one tensile and of ie bend test made for each 2 metric tons or <br />fraction thereof, of each size and kind of reinforcing steel. <br />b. Testing procedures shall conform to ASTM A615. <br />F. Concrete Sampling and Testing <br />1. Perform the following services as required to assure compliance with <br />requirements of Section 03300 "Cast -In -Place Concrete', of this <br />specification. The Contractor shall notify the Resident Engineer and <br />inspection -testing agency Of the brand and type of cement and <br />sources of aggregate in time for approval, sampling and testing (if <br />required). <br />2. Balch Plant Inspection: Batch plant inspection by the inspector shall <br />be as specified in the Building Code. Batch plant(s) shall <br />continuously monitor and control fines and content of arriving <br />aggregate at plant prior to batching. <br />3. Continuous Field Inspection: The inspector shall be present at all <br />times during the placing of structural, reinforced concrete. Prior to <br />placing concrete, he shall inspect and approve, if satisfactory, <br />accuracy of all formwork and quantity and placement of all reinforcing <br />st el. <br />4. Water: Test in accordance with ASTM C94 and CRC-C 400 as <br />appropriate. <br />5. Aggregates for normal weight concrete shall be sampled and tested <br />in accordance with ASTM C33. <br />6. Samples of concrete for air, slump, unit weight, and strength tests <br />shall be taken in accordance with ASTM C172. Concrete test <br />specimen shall be produced from concrete directly exiting the chute <br />of the truck delivering the concrete. <br />a. Air Content: Test for air content shall be performed in accordance <br />with ASTM C173 or ASTM C231. A minimum of one test per day <br />shall be conducted. <br />b. Slump test: Slump tests shall be taken every 150 cubic yards <br />delivered for each set off compression strength test cylinders, but <br />Capital Projects Commuter Rail 01400-4 IFB No. RTA/CP 21-06 <br />Everett Station Phase 2 QUALITY CONTROL <br />
The URL can be used to link to this page
Your browser does not support the video tag.