Laserfiche WebLink
SECTION 01400 <br />QUALITY CONTROL <br />drawings, schedules, certificates of compliance, pay requests, change documents, requests for <br />information, and schedules. <br />B. All records shall be maintained and retained in accordance with the Contractor's Document <br />Control Policies and Procedures. <br />C. All record documentation shall be made available and subject to audit by Sound Transit or its <br />designee. <br />PART 2 —PRODUCTS <br />Not Used <br />PART 3 — EXECUTION <br />3.01 Prior to commencing Work, the Contractor shall verify that the Site conditions are in conformance <br />with the Contract Documents. <br />END OF SECTION 01400 <br />o� <br />Capital Projects Commuter Rail 01400-13 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 QUALITY CONTROL <br />