My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
an extension of lime for an avoidable delay lhat is shown to have affected <br />critical path operations, if Sound Transit determines that an extension is <br />clair;ied to be res�onsible for the avoidable delav. A time extension, if <br />anv, shall be issued throuqh a Chanqe Order and Contractor shail not be <br />entitied to anv additional compensation or equitable adiustment. <br />D. Unavoid:�ble Delav <br />1 An unavoid�ble delav means a delav in the prosecution of the Work that <br />cannot be reaarded as avoidable under Paraqraph 10.02C. Unavoidabie <br />de'avs shall include delavs that result from causes bevond the control of <br />the Contractor and that could not have been avoided bv the exercise of <br />care prudence coordination foresiqht. and diliqence on the part of the <br />or miti atina such delav. <br />2 Examples of Unavoidable Delavs include, but are not limited to: <br />a. Acts o( God. <br />b. Fire. <br />c. War. <br />d. Riot. <br />e. Unusuallv Severe Weather. Unusuallv severe weather conditions <br />shafl not be deemed unusuallv severe if thev fail within two (21 <br />standard �ievialions from the mean of data rec.rorded bv the U.S. <br />Weather bureau far the Seattle and Tacoma metropolitan area <br />over the pasl twenly (20) vears. Impacts of or�-qoinq weather <br />conditions shall be updated weeklv bv ihe Contractor and <br />�rovided to Sound Transit. To preclude the difficuities of actual <br />measurement the parties heretc aqree that weather daia a! the <br />Site shall be expresslv deemed io be the same as that measured <br />at the Seattie-Tacoma International Airoort bv the Environmantal <br />Commerce. <br />f. Epidemic. <br />3 Extension of Time: For delavs that the Contracror has niven notice <br />�ursuant to this Section and considers to be unavoidabie, the Contractor <br />sh�ill submit to Sound Transit complete written informati�n demonstratinq <br />the P�fecl of the delav on the crilical Rath on the accepted Construction <br />Schedule. The submission shall be made vrithin ten (10) Davs after the <br />end of the occurrence that is claimed to be responsible fer the <br />unavoidable delav. Sound Transit �vill review the Contractor's submission <br />and determine the number of davs of unavoidable delav and th� effect of <br />such unavoidable delav on such critic�l�ath. �ound Trans�t mav qrant <br />Capital Projects Commuter Rail Special Provisions IFB No. RTAICP 21-06 <br />� Everell Station Phase 2 Section 00300 Page 11 _, Addenduni No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.