My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.08 <br />1.09 <br />1.10 <br />SECTION 01110 <br />SUMMARY OF WORK <br />PERMITS OBTAINED BY SOUND TRANSIT <br />A. Sound Transit has already, or will have by the date of Bid Opening, acquired the permits <br />listed below. Applicable terms and ccnditions of such permits have b�en identified in the <br />Contract Drawings, and the Contractor is responsible for complying therewith. Copies of <br />said permits will be furnished to tiie Contractor upon Notice to Proceed. <br />Construction Stormwaler General Permit, permit # WAR-007330, copy appended at the <br />end of this specification section. <br />2. Public V'/orks Permit <br />3. Building Permit. <br />PERMITS TO BE OBTAINED BY CONTRACTOR <br />A. Th e Contractor is responsible for securing and paying for any and aIi additional, pe; mits <br />re.quired for the Work. <br />B. The Contractor is responsible for meeting all of the requirements specified andlor associated <br />with each permit. <br />C. The CoMractor is responsible (or transferring coverage, for all ot the site of the Work, under <br />Construction Stormwater General Permit, permit # WAR-007330, to lhe Contractor as New <br />Permittee. The procedure for Transfer of Coverage and l'ransfer of Coverage Form are <br />appended at the end of this specification section for the Contractor's use. Upon transfer of <br />said permit, lhe Contractor is responsible for paying all associated permit fees, for complying <br />with, and paying for, all requirements of the permit, and for terminating the permit at the <br />appropriate time. <br />REFERENCE DOCUMENTS <br />A. Reference Documents are available for review by the Bidders at Sound Transit Contracts <br />Division from 8:30 a.m. to 4:00 p.m. weekdays. Data and information contained in the <br />reference documents listed below is for ihe Contractor's information. Sound Transit shall <br />not be responsible for any interpretations or conclusions drawn from the data or information <br />by ihe Contractor. <br />1. Geotechnical Report produced by Milbor Pita Associates, Inc., dated October 4, 2001 <br />and Amendments dated February 6, 2006. <br />2. Closure Report Commuter Rail Station Demolition and Remediation produced by <br />Geomatrix Consultants. <br />PART2-PRODUCTS <br />Not Used <br />PART 3- EXECUTION <br />Capital Projects Commuter Rail 01110 - 5 IFB No. RT.AICP 21-06 <br />Everett Station Phase 2 SUMtvIARY OF WORK Addend:,m No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.