Laserfiche WebLink
SECTION 01110 <br />SUMMARY OF WORK <br />Two weeks prior to beginning of a specific ��nstruction activity, the Contractor shall <br />prepare a narrative of proposed construction activities, including a schedule, to Sound <br />Transit Facility. Specifically, the following information shall be provided <br />a.) Identify the dates by which construction activity, which has the !ollowing eHects, <br />will commence and be finished <br />i. Disrupt normal tra�c flow on Hill Avenue, 33`d Street, Smith Avenue or <br />Pacific Avenue. <br />� <br />iv. <br />Disrupt access, vehic�lar or pedestrian, to any sctive business or transit <br />adjacent to lhe Site. <br />Reslrict parking on any street within or adjacenl to the Site. <br />Require work outside of normal work hours. <br />2. Sound TransiCs Resident Engineer will be responsible for issuing advance notification <br />to the public at large. However ihe Contractor shall be responsible for the day-to-day <br />or hour-by-hour coordination with local governmental a�thorities, property owners or <br />tenants when Work directly impacts normal operations, uses, or accesses. <br />3. Contractor s failure to meet minimum notification requiremeats shall not result in <br />addilional cost to Sound Transit. <br />1.06 SURVEY INFORMATION <br />A. A survey of the site is provided by Sound Transit and included in the Drawings. Sound <br />Transit has established reference benchmarks identified on the Drawings. The Contractor <br />will confirm with Sound Transit the reference survey data at lhe start of construction. From <br />the information provided, the Contractor shall develop and make such additional surveys as <br />are needed for construction, such as controi lines, slope stakes, settlement platforms, batter <br />boards, stakes fcr pipe locations and other working points, lines and elevations. Survey <br />work shall be performed under the responsible charge of a State of Washington licensed <br />lan� surveyor. The Contractor shall re-establish reference benchmarks and survey control <br />monuments destroyed by its operations at no cost to Sound Transit. Submit control work <br />and cut sheet to the Resident Engineer in advance of work operations. <br />1.07 SPECIFICATION LANGUAGE <br />A. Portions of the Specifications are written in imperative and streamlined form. This <br />imperative language is directed to the Contractor, unless specifically noted otherwise. The <br />words "shall be" shall be included by inference where a colon (:) is used within sentences or <br />phrases. <br />Exam��les: <br />a.) Aggregate: ASTM C33 <br />b.) Adhesive: Spread with notched trowel <br />Capital Projects Commuter Rail 01110 - 4 IFB No. RTAICP 21-06 <br />Everett Station Phase 2 SUMMARY OF WORK Addendum No. 4 <br />f' <br />a <br />