Laserfiche WebLink
ATTACHMENT A TO SECTION 01900 <br />fREVISIONS TO THE STANDARD PLANS AND SPECIFICATIONS <br />Meter boxes ior 3/4" services shall be Carson/Brooks #1419-12-68 (plastic) with castiron reader <br />box, or Brouks #37T (concrete), or approved equal. <br />Meter boxes (or 1" services shall t�e Carson/Brooks #1220-12-5 (plastic), or Brooks #40-1222-MB <br />(c�ncrete) with lid #40-1222 CCI, or appruved equal. <br />Meter boxes for 2" services shall be Carson/Brooks #1230-12-5L (plastic), or Brooks series 65T <br />(concrete) with rectangutar reader lid, cr approved equal. <br />FlEVISIOMS 70 THE STANDARD PLANS <br />The State oi V�'ashington Standard Plans ior Road, Bridge and Municipal Construction M21•01 <br />transmitted under Publications Transmittal No. PT 06-001, effective January 3, 2006 is made a part oi this <br />contract. <br />Appendix A- City of Everett Slandard Drawings are hereby incorporated into and made a part of this <br />contract, and supersede any conflicting requirements on ihe Standard Plans. <br />The Standard F'lans and the City of Everett Standard Drawings are further revised as follows: <br />All Standard Plans and Citv of Everett Drawinas <br />All references in the Standard Plans to "AsphaN Concrete PavemenC' shall be revised to read "Hot <br />hAix AsphalP'. <br />All re(erences in ihe Standard Plans to ihe abbreviation "ACP" shall be revised to read "HMA". <br />C-t S'�eet 2 <br />The SNOW LOAD RAIL WASHER dimensions are revised to 1 3/4" from 2", and to 7/8" trom 1". <br />C-11b Sheets 1 and 2 <br />In the PRECAST FOOTING, ELEVATION view (Sheet 1) and in ihe CAST-IN-PLACE FOOTI�!�, <br />ELEVATION view (Sheet 2), GOMMERCIAL CONCRETE is revised to CJtJCRETE CLASS 40GJ. <br />In the BREAKAWAY ANCHOR ANGLE, ELEVATION view (Sheet 2), lha welding symbol: are <br />revised to indicate that the 1/4" Inside Gussets liave 1/4" fillet weld joints, and the 1/2" End Gus��ts <br />have 1/2" fillet weld joints. <br />C-14h <br />In the TABLE, in column "B": 3- 0", 3'- 2�/:', and 3'- 4'/z" are revised to 2'- 0", 2'- 2'/;', and 2'- 4'/z" <br />respectively. <br />In the TABLE, in column "C": 2'- 4", 2'- 6 Y,", and 2'• 8 Yz" are revised to 3'- 4", 3'- 6 Y<", and 3'- 8'/z" <br />respectively. <br />G-8q Sheet 1 <br />In the ELEVATION views, in the labels LUWER SIGN POST SUPPOfiT: ihe parenthetical <br />specification "12 GAGE" is revised to "7 GAGE". <br />K-1 throuqh K-27 <br />These plans shall not be used on projecis administered by WSDOT. <br />The following are the Standard Plan numbers applicable at the time this project was advertised. The date <br />shown with each plan number is the publication ap�roval date shown in the lower right-hand corner of <br />ihat plan. Standard Plans showing different dates shall not be used in this coniract. <br />A-1 ..........................5/13/02 A-4.........................3/07/97 A-7...................10/04/05 <br />Capital Projects Commuter Rail Attachment A to Section 01900 - 36 IFB No. RTA/CP 21-06 <br />� Everett Station Phase 2REVISIONS TO THE STANDARD PLANS AND SPECIFICATIONSAddendum No.4 <br />