My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
>
Address Records
>
33RD ST
>
2400
>
CONTRACT AGREEMENT
>
2400 33RD ST CONTRACT AGREEMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 3:28:48 PM
Creation date
4/1/2017 3:32:27 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CONTRACT AGREEMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 09651 <br />RESILIENT TILE FLOORING <br />1 <br />PART1-GENERAL <br />1.1 SUMMARY <br />A. Section Includes: Vinyl composition floor tile. <br />1.2 SUBMITTALS <br />q. Product Dala: For each type of product indicated. <br />B. Samples tur Initial Selection: for each type oi iloor tile indicated. <br />C. Samples (or Verification: Full-size units of each color and pattern o( iloor tile required. <br />D. Maintenance Data: For each type of iloor tile to include in maintenance manuals. <br />1.3 QUALITY ASSURANCE <br />A. Fire-Test-Response Characleristics: As determined by testing identical products according to <br />ASTM E 648 or NFPA 253 by a qualified testing agency. <br />1. Critical Radiant Flux Classification: Class I, not less than 0.45 Wlsq. cm. <br />1.4 DELIVERY, STORAGE, AND HANDLING <br />A. Store (loor tile and installation materials in dry spaces protected from the weather, with ambient <br />temperatures maintained within range recommended by manufaclurer, but not less than 50 <br />deg F or more than 90 deg F. Slore (loor tiles on tlal surfaces. <br />1.5 PROJECT CONDITIONS <br />A. Maintain ambient temperatures within range recommended by manu(ac!•irer, but not less than <br />70 deg F or more than 95 deg F, in spaces to receive floor tile during the tollowing time periods: <br />1. 48 hours before installation. <br />2. During installation. <br />3. 48 hours after installalion. <br />B. Until Substantial Cumpletion, mainlain ambient temperatures within range recommended by <br />manufacturer, but not less than 55 deg F or more than 95 deg F. <br />C. Close spaces lo lraffic during (loor lile installation. <br />D. Close spaces to traffic for 48 hours after iloor lile installation. <br />E. Install (loor tile after other finishing operalions, including painting, have been completed. <br />Capilal Projce�s Cbmmu�cr R.�il 09(51 - I 1FI3 No. RTA/CP 21-OG <br />G��crctt Slation Phasc 2 RLSIUGNI' TILF. FLOORWG Addcndum No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.