My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST CRANE LOADING 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
CRANE LOADING
>
2400 33RD ST CRANE LOADING 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:41:23 PM
Creation date
4/1/2017 3:34:48 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
CRANE LOADING
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineers/Consultants <br />Attention: Quinn Golden, P.E. <br />Company: Granite Construction Inc. <br />From: Joe Schrank, P.E. and Frank Pita, P.E., L.E.G. <br />Job No: 4070.8 <br />Date: December 23, 2008 <br />Subject: Evaluation of Water Main Loading <br />Everett Station <br />Everett, Washington <br />Hi Quinn, <br />Per your request, Jacobs Associates (JA) ;-erformed a preliminary evaluation of <br />the loading on the existing water main at Everett Station due to the crane pick of <br />a pedestrian bridge. There is an existing 48-inch diameter water main that was <br />constructed in 1930 and owned by the City of Everett in the project area, and the <br />crane is likely to be above the water main during the crane pick. <br />We understand that the City of Everett is requiring a geotechnical evaluation of <br />the loading on the water main during the crane pick. The purpose of our work <br />was to: <br />1. Estimate the loading on the water main during the crane pick; <br />2. Identify the allowable pressure on the water main due to the crane pick; <br />and <br />3. Recommend precautions that should be taken to protect the water main <br />and allow the crane to set-up over it. <br />Background Information <br />Based on information provided by you in emails and conversations with us <br />between Tuesday, December 16 and Friday, December 19, we understand that <br />the pedestrian bridge will be picked up with a Grove GMK 7550 rubber -tired <br />crane. You provided the expected outrigger loading of the crane during the pick, <br />the crane dimensions, and a plan map showing the water main and the <br />approximate location of the crane. You reported that the minimum depth to the <br />concrete casing above the water mein was 5.9 feet below the existing ground <br />surface, and the concrete casing was .;ix feet wide. <br />We also understand that: <br />o 1 he City of Everett has stated that HS 20 live loading is allowable over the <br />water main, and a higher loading may be acceptable if our analysis shows <br />that the water main can safely bear the additional load. <br />1109 First Avenue, Suite 501 Seattle, WA 98101-2963 Phone: (206) 588-8200 Fax: (206) 588-8201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.