My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST GEOTECHNICAL INVESTIGATION 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
GEOTECHNICAL INVESTIGATION
>
2400 33RD ST GEOTECHNICAL INVESTIGATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:49:33 PM
Creation date
4/1/2017 3:36:00 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
GEOTECHNICAL INVESTIGATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW 0Q)0 LA-02-0 <br />Milbor-Pita <br />�s4SSOCIATES, INC. <br />lX 6 February 2006 <br />Scnl by Email only #1567 <br />Zimmer Gunsel Frasca Partnership <br />925 Fourth Avenue, Suite 2400 <br />Seattle, Washington 98104 <br />Attn: Mr. Don Miles <br />cc: Ms. Sandy Glover, INCA Engineers <br />RE: Addendum: Geoleclrnical Report, Proposed Sound Transit Parking Lot, <br />Everett, Washington <br />General <br />This report is an addendum to the Milbor-Pita & Associates, Inc. (MPA) report entitled <br />"Geotechnical Report: Proposed Sounder Everett Station Facility, Everett, Washington <br />(ZGF Project No. 90524.01)" dated 4 October 2001, which was submitted to ZGF, INCA <br />and Sound Transit. This addendum presents the geotechnical engineering <br />recommendations completed by MPA for the design and construction of the proposed <br />Sound Transit Parking Lot in Everett, Washington. Zimmer Gunsel Frasca (ZGF) and <br />INCA Engineers both have copies of the original 2001 report; it has NOT been included <br />with this addendum. <br />Proiect Description <br />Please see MPA 2001 report. <br />Authorization <br />Our work was conducted in general accordance with our proposal letter dated 6 <br />December 2005 and submitted to Zimmer Gunscl Frasca Partnership by email. We <br />received verbal Notice to Proceed for the proof rolling and coring from Val Baley of <br />Sound Transit effective 13 December 2005. This report has been prepared for the <br />exclusive use of Zimmer Gunsel Frasca Partnership and its authorized agents, for specific <br />application to this project in accordance with generally accepted geotechnical/civil <br />engineering practices. <br />Purpose and Sco e of Work <br />The purpose of this addendum was to: <br />• Assess surface and subsurface conditions along the off site stormwater pipeline <br />route; <br />• Assess the suitabilitii of on -site soils for pavement subgrade and landscaping <br />r�%umoscs; and <br />rindations rel d to paveme design and si 36 <br />M�� Jr <br />11270 Woodinville-Redmonr, 703 Phone (425) 486.6561 <br />WoMineille, WA 98072 Page I Paa (425)488-2660 <br />
The URL can be used to link to this page
Your browser does not support the video tag.