Over -excavation and Subgrade Preparation Recommendations <br />As state(] in the MPA 2001 report, the site is underlain by medium dense, crushed <br />granular soil over undocumented fill and medium stiff to very stiff glacially deposited <br />silts and clays. Based on the results of the proof -rolling investigation, it is our opinion <br />that the sandy gravel will provide suitable bearing for the pavement. <br />As discussed above, there is a 1.2 to 1.5 foot layer of material, which overlies the site that <br />is suitable for pavement subgrade. However, ti:>. site has not yet been contoured to the <br />final subgrade elevations. There may be areas of the site where portions of this layer are <br />excavated to improve site drainage. The depth and extent of these excavations are not <br />known at this time. <br />It is important that the cut areas have a minimum of 1_5 feet of competent subgrade soils <br />beneath the final subgrade elevations prior to pavement placement. This is to minimize <br />the potential for settlements and provide uniform subgrade support. In areas where the <br />granular layer is cut into or excavated completely, additional unsuitable soil should be <br />over -excavated and backfilled with compacted structural fill, so there is always a 1.5 foot <br />layer of competent soil beneath the final pavement subgrade elevations. This over - <br />excavation and backfilling should be done at the direction of the Engineer. <br />An alternate plan to over -excavating to provide a 1.5 foot layer of competent subgrade <br />beneath the final pavement subgrade elevations is to over -excavate such that there is a <br />12-inch layer of competent subgrade and use a geotcxtile. The cut areas would be over - <br />excavated, a geotextile placed at the bottom of the excavation, and then the excavation <br />backfilled with compacted structural fill. A woven, polypropylene, permeable geotextile, <br />such as Mirafi Geolon IIP-370 or equivalent could be used at the base of the excavation. <br />The structural fill and compaction- methods should comply with the recommendations <br />outlined in the MPA 2001 report. <br />Detention Vaults <br />In addition to the recommendations provided in the MPA 2001 report, we recommend <br />that there is 18 inches of compacted structural fill underneath the vaults to minimize <br />s--ttlement. Also, ditching around the vault foundation pad may be required so that both <br />rain, surface and groundwater is conveyed to the outside. The water can then be pumped <br />out as required. <br />Recommendations for Pond Filling <br />There is in existing drainage detention pond on site. We understand that the pond is <br />approximately four feet deep and will be filled as part of the site preparation. Our <br />recommendations for filling the pond are as follows: <br />• Drain the pond; <br />• Place onsite material as fill up to the level of 24 inches below the surface of <br />subgrade. <br />Geolechnical and Tunnel Consultants <br />17270 Woodinville -Redmond Rd, Ste 703 Phone (425) 486-6561 <br />Woodinville. WA 98072 Page 5 Fax (425)488-2660 <br />