• Place a geotextile, Mirafi Geolon HP-370 or equivalent over the fill. The <br />geotextile should be polypropylene to resist chemicals, woven, and permeable; <br />and <br />• Place structural fill to the height of final subgrade and compact as specified in the <br />Structural Fill Materials and Compaction Section in the October 2001 report. <br />If the pond is deeper than we understand, the pond can be drained and unsuitable backfill <br />placed to a depth two feet below the level of the final subgrade. The geotextile should <br />then be placed on the fill, and the remaining two feet be backfilled with compacted <br />structural till, as described above. <br />Recommendations for Design of Pavement Section <br />We have compared the recommended pavement thicknesses in the City of Everett <br />Standards for Streets and Related Work with the recommendations in the MPA 2001 <br />report. These are shown in 'rabic 2 below. <br />m..M..e_ir... kf:v A.. hnIt (1rMA) R,.rnmmnnded Pavement Section <br />Source <br />Location <br />Thickness <br />City of Everett Standards <br />_ <br />Packing Areas <br />• 2 inches of HMA <br />• 4 inches of Crushed Surfacing <br />Base Course (CSBC) <br />MPA 2001 Report <br />Parking Areas <br />• 3 inches HMA <br />• 4 inches CSBC <br />MPA 2001 Report <br />i;ntrance Driveways <br />. 4 inches HMA <br />• 8 inches CSBC <br />Pavement sections for the project were designed based on site soil conditions and <br />expected traffic loads. Our evaluation assumed that the pavement sections would be <br />constructed on subgrades prepared as described in the Site Earthwork section of the MPA <br />2001 report and the Over -excavation and Subgrade Preparation section above. The <br />uppermost 18 inches of soil beneath the pavement section must consist of dense to very <br />dense granular soil, either natural soil or structural fill. We recommend that base course <br />materials conform to WSDOT Crushed Surfacing — Base Course (9-03.9(3)). We <br />recommend that an MPA representative be on site to observe pavement subgrade <br />preparation. <br />We have also reevaluated the pavement design section Subgrade soils for the pavement at <br />the Everett site are anticipated to be fill material. A California Bearing Ratio (CBR) of <br />15 should be used for the properly compacted in -place fill material. The corresponding <br />values of modulus of Subgrade reaction, for both the CBR values and the density of the <br />soil, would be approximately 225 pounds per cubic inch (pci) for the fill (Reese, 1974). <br />The existing site soils are considered to have moderate frost susceptibility. <br />The Asphalt Concrete (AC) pavement design was based on the methods outlined in <br />Designs and Specifications for Asphalt Concrete Pavements and Bases, published by the <br />Geotechnical and Tunnel Consultants <br />17270 Woodinville -Redmond Rd, Ste 703 Phone (425) 486-6561 <br />Woodinville, WA 98072 Page 6 Fax (425) 488-2660 <br />