My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2400 33RD ST GEOTECHNICAL INVESTIGATION 2018-01-02 MF Import
>
Address Records
>
33RD ST
>
2400
>
GEOTECHNICAL INVESTIGATION
>
2400 33RD ST GEOTECHNICAL INVESTIGATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 3:49:33 PM
Creation date
4/1/2017 3:36:00 PM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
2400
Tenant Name
GEOTECHNICAL INVESTIGATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Place a geotextile, Mirafi Geolon HP-370 or equivalent over the fill. The <br />geotextile should be polypropylene to resist chemicals, woven, and permeable; <br />and <br />• Place structural fill to the height of final subgrade and compact as specified in the <br />Structural Fill Materials and Compaction Section in the October 2001 report. <br />If the pond is deeper than we understand, the pond can be drained and unsuitable backfill <br />placed to a depth two feet below the level of the final subgrade. The geotextile should <br />then be placed on the fill, and the remaining two feet be backfilled with compacted <br />structural till, as described above. <br />Recommendations for Design of Pavement Section <br />We have compared the recommended pavement thicknesses in the City of Everett <br />Standards for Streets and Related Work with the recommendations in the MPA 2001 <br />report. These are shown in 'rabic 2 below. <br />m..M..e_ir... kf:v A.. hnIt (1rMA) R,.rnmmnnded Pavement Section <br />Source <br />Location <br />Thickness <br />City of Everett Standards <br />_ <br />Packing Areas <br />• 2 inches of HMA <br />• 4 inches of Crushed Surfacing <br />Base Course (CSBC) <br />MPA 2001 Report <br />Parking Areas <br />• 3 inches HMA <br />• 4 inches CSBC <br />MPA 2001 Report <br />i;ntrance Driveways <br />. 4 inches HMA <br />• 8 inches CSBC <br />Pavement sections for the project were designed based on site soil conditions and <br />expected traffic loads. Our evaluation assumed that the pavement sections would be <br />constructed on subgrades prepared as described in the Site Earthwork section of the MPA <br />2001 report and the Over -excavation and Subgrade Preparation section above. The <br />uppermost 18 inches of soil beneath the pavement section must consist of dense to very <br />dense granular soil, either natural soil or structural fill. We recommend that base course <br />materials conform to WSDOT Crushed Surfacing — Base Course (9-03.9(3)). We <br />recommend that an MPA representative be on site to observe pavement subgrade <br />preparation. <br />We have also reevaluated the pavement design section Subgrade soils for the pavement at <br />the Everett site are anticipated to be fill material. A California Bearing Ratio (CBR) of <br />15 should be used for the properly compacted in -place fill material. The corresponding <br />values of modulus of Subgrade reaction, for both the CBR values and the density of the <br />soil, would be approximately 225 pounds per cubic inch (pci) for the fill (Reese, 1974). <br />The existing site soils are considered to have moderate frost susceptibility. <br />The Asphalt Concrete (AC) pavement design was based on the methods outlined in <br />Designs and Specifications for Asphalt Concrete Pavements and Bases, published by the <br />Geotechnical and Tunnel Consultants <br />17270 Woodinville -Redmond Rd, Ste 703 Phone (425) 486-6561 <br />Woodinville, WA 98072 Page 6 Fax (425) 488-2660 <br />
The URL can be used to link to this page
Your browser does not support the video tag.