Laserfiche WebLink
Pusuc WORKS <br />PERMIT <br />09FT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257.8810 <br />OWNER NAMB. APPLIC <br />ANDADDRESS!eff S Caroline Mason AND AD <br />612 — 34th Street <br />EVERETT WA 93201 <br />PHONE: 4252584977 I PHONE <br />Date 5/9/2002 <br />Public Works Permit NPWO205-1011 <br />Building Permit N <br />Planning Reference N <br />Public Works Fee S $ 4 0. 0 0 <br />Guarantee $ <br />LD.x PROJECT ADDRESS: <br />612 34th St <br />PROPOSED WNomiRetaining wall in ROW <br />PW <br />PERMIT CONDITIONS <br />1. All cells for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. As per approved plan dated 5/9/02. W <br />5. All portions of tha wall shall have a footing and any portions of <br />the wall that measures 4' or more from the bottom of the footing to the <br />top of the wall shall conform to the requirements of "Retaining Wall CD <br />Schedule 'A' " (attached). <br />6. Keep city streets clean at all. times during construction. m <br />0 <br />WpProvee for Go ruction Dale <br />� <br />FINAL INSPECTION <br />Approved as Consnucted Dale <br />iI <br />05-10-02 10:564M 0 <br />11 0205011 <br />OTHER 40.00 <br />TOTAL 40.00 <br />GI-6EF;. 4� <br />A OM7873 Q. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remAJ�ve same u notice trom the City and to replace public <br />fir opdrty damagee)l! Orebjj,-f <br />of <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND TIER AFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PRO CT OVER 90 DAYS DURATION. <br />