Laserfiche WebLink
Ciry of Gverett <br /> Building Department -3- March 28, 2006 <br /> ,� f',eiternl Conunents <br /> Response: The consWction sequence an Shee[ CLO has been modified to more <br /> specifically address the phasing of work in and adjacent to the wetlands. This sequence <br /> for Phase I work was based on meetings with the contractor to determine a logical <br /> progression of work. <br /> Thr. Storm Drainage Report has been revised per your comments and subsequenc <br /> Jiscussions with our office. The grinder pump specifications were acceptable to you at <br /> timc of firs[submittal. <br /> We belicve that the above re�,onses, together �vith the enclosed revised plans and supporting <br /> documentation, address all of your agcncy's plan check comments. Plcase initiate your review of the <br /> enclosed documenls at your earliest convenience. Should you have questions regarding this matter, <br /> please contact me ut(425)251-6222. Thank you. <br /> Respectfully, <br /> �Z� T ' !/`-^' <br /> M. Alexia lnigues <br /> Project Planner <br /> MAllvj <br /> G22Gc.OGl.doc <br /> :;nc: As Noted <br /> cc: Kim Sanford, Costco Wliolcsalc (w/enc) <br /> Lisa Horn, MulvannyG2 Architecture (w/enc) <br /> Jay S. Grubb, Burghausen Consulting Gngineers, [nc. <br /> P. AI Kcndall, Barghausen Consulting Lngincers, Inc. <br /> ]ohn Elllingsen, Barghauscn Consulting Engineers,Inc. <br /> �3 <br />