My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:21:02 AM
Creation date
4/2/2017 9:18:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington HYDRAULIC PROJE��APPROVAL Norih?ugetSound <br /> Oepartment ol 16018 Mill Creek Boulevard <br /> FIS4 antl RCW 77.55.021-Appeal p�rsuant lo Chapter 34.05 RCW A1ill Creek,WA 98072-1296 <br /> WILDLIFE (425)775-1371 <br /> Issue Date:April 03,2006 ConVol Nvmber: 10444G-1 <br /> Projecl Expiration Dale: December 31,2007 FPA/Public No�ice#: N/A <br /> PERMITTEE AUTHORIZED AGENT OR CONTRACTOR <br /> Cosico Wholesale Corp. Barghausen Consulting Engineers, Inc <br /> ATTENTION: Kim Sanford ATTENTION:Alexia lnigues <br /> 999 Lake Dr 18215 72nd Avc�ue S <br /> Issaquah,WA 9A027 Kent, WA 98032 <br /> 425-313-8100 425-251•6222 <br /> Fax:425-313-8105 Fax:A25-251-8782 <br /> Project Name: Costco Outtall <br /> Project Description: Install outfall <br /> PROVISIONS <br /> 1. TIMING L!MITATIONS: The project may begin immediately and shall be completed by <br /> December 31, 2007. <br /> 2. NOTIFICATION REQUiREMENT: The Area Habitat Biologist listed befow shall be contacted by <br /> pho�e or e-mail (hoisegh@dfw.wa.gov)within seven days of completion of work to arrange for a <br /> compliance inspection. The notification shall include the permittee's name and the control number <br /> for this HPA. <br /> 3. 'tNork shall be accomplished per plans and specifications approved by the Washingto� <br /> Department of Fish and �Nildlife entitled Costco Gasoiine, Grading and Storn Drainage Plan, <br /> 10200 19th Ave SE, Everett, Washington 98208, Location #114 and dated February 2, 2006, <br /> except as modified by this Hydraulic Project Approval. A copy of these plans shall he available on <br /> site during construction. <br /> 4. The stream bank at the point of the discharge shall be armored to prevent scouring. <br /> 5. Any rock armoring placed below the wetted perimeter shall be rounded streambed gravel sized <br /> to match the existing streambed gravel. <br /> 6. Excavation for the placement of the structure or armoring materials shall be isolated from the <br /> wetted perimeter. <br /> 7. Alteration or disturbance of the bank and bank vegetation shall be limited to tha! necessary to , <br /> construct the project. Within seven calender days of project completion, all disturbed areas shall ' <br /> be protected from erosion using vegetation or other means. Witf�in one year of project completion, <br /> the banks, including riprap areas, shalf be revegetated with native or other approved woody <br /> species. Vegetative cuttings shall be planted at a maximum interval of three feet (on center) and <br /> maintained as necessary for three years to ensure 90 percent survival. <br /> Pege 1 of 4 <br />_. _. __ _ — . _ __ _ ___. _ _... . __. _. . _ _ _ __ _ --- — -___ . _ _ _,^• - <br /> __ �-�..-- _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.