My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO FUEL STATION
>
10200 19TH AVE SE COSTCO FUEL STATION 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:21:02 AM
Creation date
4/2/2017 9:18:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO FUEL STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wa5h��9; HYDRAULIC PROJECTAPPROVAL NonhPugetSound <br /> Department ul 16078 Mill Creek Boulevard <br /> ,. FISH and RCW 77.55.027-Appeal pursuant to Chapter 34.05 RCW Mill Creek,WA 98012-1296 <br /> WILDLIFE (425)775-1371 <br /> Issu� Date:April 03,2006 Control Number: 104446-1 <br /> Project Expiralion Dale: December 31,2007 FPA/Public Notice#: N/A <br /> 8. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or <br /> water quality problems develop (ir.:iu�ing equipment leaks or spills), immediate notification shall be <br /> made to the Washington Departme:nt of�cology at 1-800-258-5990, and to the Area Habitat <br /> Biologist listed below. <br /> 9. Every effort shall be taken during all phases of this project to ensure that sediment-taden water is <br /> not allowed to enter the stream. <br /> 10. Erosion control methods shall be used to prevent silt-laden water from entering the stream. <br /> These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds, <br /> check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of <br /> exposed areas. <br /> 11. Prior to starting work, temporary filter fabric, straw bale, or pea gravel-filled burlap bag check <br /> dam(s) shall be installed downstream. Accumulated sediments shall be removed during the project <br /> and prior to removing the erosion control methods after the completion of work. <br /> 12. Wastewater from project activities and water removed from within the work area shall be routed <br /> to an area landward of the ordinary high water line to allow removal of fine sediment and other <br /> contaminants prior to being discharged to the stream. <br /> 13. All waste material such as construction debris, silt, excess dirt or overburden resulting from this <br /> project shall be deposited above the limits of flood water in an approved upland disposal site. <br /> 14. If high flow conditions that may cause siltation are encountered during this project, work shall <br /> stop until the flow subsides. <br /> 15. Extreme care shall be taken to ensure that �o petroleum products, hydraulic fluid, fresh cement, <br /> sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are alloH�ed <br /> to enter or ieach into the stream. <br /> PROJECT LOCATIONS <br /> Location #1 Costco Outfall <br /> WORK START: April 04, 2006 WORK END: December 31, 2007 <br /> WRIA: Waterbody: Tnhutary to: <br /> 08.6029 Silver Lake North Creek <br /> 1/4 SEC: Section: Township: Range: Latilude: LangiWde: County: <br /> All 19 27 N 05 E N 47.9040 W 122.2073 Snohomish <br /> Localion p1 Dnving Oireclipns � <br /> Unnamed Uib to Silver Lake <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.