My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
10315
>
SITE DEVELOPMENT
>
10315 19TH AVE SE SITE DEVELOPMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 9:50:17 AM
Creation date
4/2/2017 9:49:57 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10315
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The vegetated treatment cell planting notes shall include a calculation of the amount of <br /> azea to be planted, and shall li�t a speci6c number of plants oteach selected type. The <br /> planting location within the veoetated treatment cell shall also be specified. <br /> Planting densiry is one plant per square foot in the Silver Lakr:7rainage basin. <br /> Storm Filter comments: <br /> De!ails of the SMI StormFilter must be provided which show the dimensions of the vaalt, ]/�� <br /> number and orientation of fclter c:irtridges, inlet and oudet elevations, etc. ��, <br /> Pump b.isin: <br /> The source of power for the pump must be shown on the drainage plan, and Ihe design of CvK�rc� <br /> the electrical feed and connection must be approved as part of the building permit.P� /A��� IL,�+1 <br /> The plans must include a detail showing the pump chamber, induding on-off elev�i°om G" 5��'* � <br /> for the pumps, high-water alarm elevation, inlet and oudet elevations, etc. � ,��,,,���y � �"'"'�-' <br /> J <br /> The followin� udditional notes shall be nrovided on the drainake nlans: <br /> Thc welvault(s) and/or wetpond(s) and/or vegetxted treatment cell(s) must pass a Icak test <br /> bef'ore the project will reccive final approval. Vuults and ponds must be tilled with watcr u�� <br /> to the elevation of the ouUcts, and inflow prevented for 24-hours. To p-:ss the Ieak test, ��� <br /> the water clev�uion may not drop more than 2-inches in the 24-hour period. PonJ soils ��� <br /> should be saturated bet�ore bcginning the 24-hour test period. <br /> The StormPilter shall be maintained annually and a certificate of mairtenuncc shall bc �a7E <br /> provided to the Ciry of Evcrcu's Surface Walcr Managemeut Proeram. 32(�Cedar Strect, ED. <br /> Everctt. WA 98201. ,¢DD <br /> Additional comments are writtcn directiv on the plans. <br /> s:\j zi nuncrm\�curd\pr_sl mcd ira I �3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.