My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11014 19TH AVE SE 24 HOUR FITNESS 2018-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11014
>
24 HOUR FITNESS
>
11014 19TH AVE SE 24 HOUR FITNESS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 1:38:12 PM
Creation date
4/2/2017 11:06:16 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11014
Tenant Name
24 HOUR FITNESS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> � Mr. Ryan Sass <br /> July 14, 2006 <br /> Page 6 <br /> � MITIGATION <br /> � The City of Everett has established an area wide tra�c mitigation fee of 5900.00 per new PM <br /> peak-hour trip generated by developments. 'i he Silver Lake Center development would <br /> generate 302 ne�v PM peak-hour trips, based on 200 apartr.�ent units, 51,400 SF of general <br /> � office and 153,400 SF of shopping center and after credit for the existing uses, bet before <br /> reduction for internal crossover. <br /> � As stated previously based on standard ITE methodology the mixed use development should <br /> receive a reduction of 15% due to internal crossover trips 1'or the residences using the <br /> � shopping centar or office services, or office employees using the sUopping center. These trips <br /> would not impact the road system. The 15% intemal crossover reduction would result in 256 <br /> new PM peak-hour trips onto the road system and the development will only be required to <br /> 1 pay mingation fees of$230,400. <br /> I � The mitigation for each use has been calculated based on the percentage of total trips <br /> j generated by each use. This percentage has been multiplied by che development's total new <br /> � trips to determine how many new trips each use will generate. The 200 apartment units will <br /> be responsible for $48,6�0, equivalent to 5246.29 per wiit. The 51,400 square feet of general <br /> I office will be responsible for $29,700, equivalent to $0.60 per square foot. The 1�3,400 <br /> square fee[of shopping center will be r:sponsible for$152,100, equivalent to $0.98 per square <br /> foot. <br /> I <br /> CONCLUSION <br /> �. The increase in development size for the Silver Lake Center will result in 2,836 new daily <br /> trips and 302 new PM peak-hour trips. Th?s is an increase of 742 daily trips and 81 PM peak- <br /> I hour trips over the previous Perteet traffic impact analysis from March 3, 2004. The <br /> � intersections analyzed by GTC indicated that with WSDOT's latest improvements at the study <br /> I intersections wi!1 operate at acceptable levels of service with this increase in development <br /> trips. <br /> � GTC recommends that the developtnent provide at least 125 feet of throat length on the <br /> westbound approach (east leg) at the 112`h Street SE intersection, the approach on the <br /> development's site. The rotal mitigation fees for the development will be $230,430. 'I'here <br /> ( will be no credit for any Crontage improvements required by the City of Everett. <br /> 1 <br /> � <br /> � 0 � �Ua <br /> RAFFIC <br /> Ob�NJd4l�a4�3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.