My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11020 19TH AVE SE BARTELL DRUGS 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11020
>
BARTELL DRUGS
>
11020 19TH AVE SE BARTELL DRUGS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 10:51:48 AM
Creation date
4/2/2017 11:43:52 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11020
Tenant Name
BARTELL DRUGS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service <br /> orders, please contact Marilyn Davis Westlund at (425)?56-7512 at least 90 days <br /> prior to the required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the developer's <br /> sole expense, and requires 90 days minimum notice. Please contact Elaine Babby <br /> at (206)224-2018 to coordinate relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. For further information about the electrical service requirements for <br /> this project, please call Kurt Martin of the DistricYs Customer Engineering Office, <br /> Everett at 258-8291. <br /> 3. Verizon Northwest has facilities near this location. However, any building entrances <br /> must be coordinated at least 60 days in advance. The cost of any relocation of <br /> Verizon facilities that is required to construct the new apartments �vill be at the total <br /> expense of the developer. Any relocation will take 60 to 120 days. Please contact <br /> Mike Hupf, Engineer at (425)356-4052 or Mike Bly, Engineer at (425)356-4034 if you <br /> have any questions regarding this building entrance. <br /> 4. Verizon Northwest will provide service to the site. However, new telephone cable <br /> construction will be required in conjunction with the site development. Verizon's <br /> engineering will begin when they are notified of your construction schedules and <br /> telephone requirements. <br /> 5. It will be the developer's responsibility to provide a suitable combination c+f conduit <br /> and trenching and/or riser conduit to accommodate Verizon's network <br /> communications cable within the complex. Provided that an acceptable combination <br /> of conduit and/or trenching is incorporated into the project to accomrnodate Verizon's <br /> er,trance cable, there will be no costs to the developer for Verizon's cable. <br /> 6. If a rearrangement of existing cables on premises or on the right-of-way is <br /> necessary, appropriate charges will be estimated and Verizon's Guaranty of <br /> Payment form will be forvvarded to you for your signature. Prior to commencement of <br /> Verizon's engineering for such rearrang2ment, a deposit will be required. To insure <br /> timely telephone service, Verizon requests ninety (90) days lead time for <br /> engineering, procurement, and installation of cable andlor Verizon's equipment. <br /> Please contact Michael Hupf, Engineer, at (425}356-4052 or Mike Bly, Engineer at <br /> (�25)356-4034 should you require additional infvrmation. ,i <br /> S:\FSiddiqlWINWOR�\SEPA\SEPA04_057 finaI.DOC � <br /> 7 I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.