Laserfiche WebLink
GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service <br /> orders, please contact Marilyn Davis Westlund at (425)?56-7512 at least 90 days <br /> prior to the required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the developer's <br /> sole expense, and requires 90 days minimum notice. Please contact Elaine Babby <br /> at (206)224-2018 to coordinate relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. For further information about the electrical service requirements for <br /> this project, please call Kurt Martin of the DistricYs Customer Engineering Office, <br /> Everett at 258-8291. <br /> 3. Verizon Northwest has facilities near this location. However, any building entrances <br /> must be coordinated at least 60 days in advance. The cost of any relocation of <br /> Verizon facilities that is required to construct the new apartments �vill be at the total <br /> expense of the developer. Any relocation will take 60 to 120 days. Please contact <br /> Mike Hupf, Engineer at (425)356-4052 or Mike Bly, Engineer at (425)356-4034 if you <br /> have any questions regarding this building entrance. <br /> 4. Verizon Northwest will provide service to the site. However, new telephone cable <br /> construction will be required in conjunction with the site development. Verizon's <br /> engineering will begin when they are notified of your construction schedules and <br /> telephone requirements. <br /> 5. It will be the developer's responsibility to provide a suitable combination c+f conduit <br /> and trenching and/or riser conduit to accommodate Verizon's network <br /> communications cable within the complex. Provided that an acceptable combination <br /> of conduit and/or trenching is incorporated into the project to accomrnodate Verizon's <br /> er,trance cable, there will be no costs to the developer for Verizon's cable. <br /> 6. If a rearrangement of existing cables on premises or on the right-of-way is <br /> necessary, appropriate charges will be estimated and Verizon's Guaranty of <br /> Payment form will be forvvarded to you for your signature. Prior to commencement of <br /> Verizon's engineering for such rearrang2ment, a deposit will be required. To insure <br /> timely telephone service, Verizon requests ninety (90) days lead time for <br /> engineering, procurement, and installation of cable andlor Verizon's equipment. <br /> Please contact Michael Hupf, Engineer, at (425}356-4052 or Mike Bly, Engineer at <br /> (�25)356-4034 should you require additional infvrmation. ,i <br /> S:\FSiddiqlWINWOR�\SEPA\SEPA04_057 finaI.DOC � <br /> 7 I � <br />