My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11311 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
11311
>
11311 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 11:10:23 AM
Creation date
4/2/2017 12:44:30 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11311
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—. 1 <br />O t1 x <br />C H <br />9xyHxtn <br />tHZH <br />fC C] <br />H H <br />CO) H,r3 <br />ti7 O <br />H t7 <br />OH ��yy <br />H t%J <br />H <br />9H <br />t x <br />Hto <br />H <br />c� t7 O <br />Z H to <br />HOM <br />CUAWi <br />r <br />OWL r' <br />the wetland area shall be clearly identified, marked, and roped off to <br />prevent accidental destruction. Additional plantings must be provided <br />in the wetland buffer area to Department of Ecology specifications. <br />The developer shall also provide a $10,000 bond for five years or set <br />aside an amount that will be used for restoration if vegetation <br />proposed for preservation is damaged or removed, or if the wetland is <br />damaged. <br />8. A detailed site plan addressing all of the Department of Ecology's <br />(DOE) wetland concerns shall be approved by DOE prior to issuance of <br />any development permits for this project. <br />9. The tot lot shall be centrally located for adequate parental <br />supervision. <br />10. Detailed drawings in accordance with City Design and Construction <br />Standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the <br />public right-of-way. Public Works Department approval of these <br />drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved and warranted before the <br />Occupancy Permit is issued. <br />11. Dedication of right-of-way on S.R. 527 is required per the Silver Lake <br />Traffic Study on the proposal's full frontage. <br />12. A five year performance guarantee is required for the full construction <br />of street and utility improvements to the frontage of S.R. 527. <br />13. The Applicant will be required to sign a Local Improvement District <br />Covenant for street improvements to S.R. 527. <br />14. The Silver Lake frontage and shorelands must be dedicated to the City <br />by a statutory warranty deed. <br />15. The City may, at some time in the future, restrict turning movements to <br />right turn only for ingress and egress if problems develop on S.R. <br />527. Any City action taken to restrict ingress and egress shall be a <br />condition of this Permit. <br />16. The existing water system in the area can provide only 3,500 - 3,700 <br />gal./min. To provide adequate fire protection, a looped water system <br />from the Bothell Everett Highway to another existing water main will be <br />required. This may be coordinated with adjacent proposed <br />developments. Exact water system requirements will be determined after <br />consultation with the Fire Marshal. <br />_o <br />
The URL can be used to link to this page
Your browser does not support the video tag.