My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11325 19TH AVE SE 2018-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11325
>
11325 19TH AVE SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2019 1:46:23 PM
Creation date
4/2/2017 12:53:37 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11325
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i i, <br /> SETTLEMENT AGREEMENT WITH SLAC: <br /> i <br /> The settlement agreement requires additional surface water <br /> protection measures beyonc! what the City would typically I <br /> require. Due to this agr�eement, a baffle-type oil/water <br /> separator and prohibition of vehicle maintenance on the �� <br /> property are required. <br /> Oil/water separator(s) <br />� ! If possible, the oil/water separator(s) should be located <br />, � upstream of both vegetated swales. At the very least, the <br /> separator must be located upstream of the wetpond. <br /> City atandards call for the vault to have an inlet capacity <br /> determined by using the rational formula with a rainfall • <br />', intensity of 0.5 inches per hour. <br /> The vault must be sized to provide a 15 minute detention <br /> time for the design flow. <br /> BypaRs piping is required for the v�ilt per City standards. <br /> The vault inlet capacity should be reached at the point that <br /> the water elevation in the bypass pipe is at its peak for <br /> the 10 year storm. orifice sizing calculations must be <br /> submitted that show that the provided vault inlet meets this <br /> requirement, along with separator design flow and sizing <br /> calculations. <br /> The entire contributing area must be used in calculating the <br /> . size of the oil/water separator vault although only the <br /> paved surface is required to be routed through the <br /> separator. <br />� • <br /> ' The oil/water separator maintenance notes from section <br /> 4.11.1 of the City of Everett Design and Construction <br /> Standards and Specifications must be included on the plans. <br /> Vehicle maintenance <br /> The tenant lease or rental agreement for this project must (" <br /> contain a clause prohibiting vehicle maintenance on the <br /> site. A covenant must be recorded and signed by the owner <br /> atating that such a clause will be written into the tenant I:; <br /> � leases ar.d/or rental agreements. <br /> f.: <br /> 1 Y�@ yp��.../� e � . . I � 1 �. <br /> � �I'�� I�' � - I � ] <br /> ;���ri <br /> 1 I � � t <br /> (M1 <br /> i � 1� <br /> 2 ��� 1 + <br /> Y � T ' <br />� 1 ��":t�n _ -I e �.� <br />� + .',;4f ,� � , � <br /> J � <br /> 1 q � <br /> I `� " � ' <br /> i '1 <br /> I <br />� J � <br /> , K�� .. . . . .. . . .. � .. . �.. . . <br /> a-Y.�u.�..� .�- ......n.,.. .. . . .. .. - - . .. . .. .. 1 .v. �,.'� <br /> y� <br /> I <br /> � , ' <br />� � : <br /> 1. <br /> I <br /> i <br /> I <br />� . . . �•1��. <br /> ' �I <br /> . + <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.