Laserfiche WebLink
EVALUATION FOR <br /> AG�NCY USE ONLY <br /> 4) �Vill the proposal require surface water withdrawals or diversions? Give <br /> general description, purpose, and approximate quantities iF known. <br /> No. <br /> 5) Does the proposal lie within a 100-year tloodplain? [f so, note location on <br /> the site plan. <br /> The site dces not lie within the 100-year floodplain of any water body. The <br /> floodplain of 530' is located west of the siCe. See Figure 3 -- Pre(iminary Srte <br /> Design. <br /> 6) Does the proposa! involve any discharges of waste materials to surface <br /> waters? If so, describe the typ� of �vaste and anticipated volume of <br /> discharge. <br /> No waste ma[erial will be discharged to surface waters. <br /> b. Ground: <br /> 1) Will ground water be withdrawn, or will water be discharged to ground <br /> water? Gi�•e general description, purpose, and approximate quantities if <br /> known. <br /> [Vo groundwater will be withdrawn. <br /> 2) Describe waste material that will be discharged into the ground frum septic <br /> tanks or other sources, if any (for example: Domestic sewage; industrial, <br /> containing the following chemicals...; agricultural; etc.). Describe the <br /> general size of the system, the number of such systems, the number of <br /> houses to be served (if applicable), or the number of animals or humans lhe <br /> system(s) are expected to serve. <br /> [Vo waste material is proposed to be dischar�ed into the ground. <br /> c. Water Runoff ('including storm water): <br /> 1) Describe the source of runoff ('includiag storm water) and method of <br /> collection and disposal, if any (include qaantities, if l�own). Where will <br /> this water flow? Will this water flow into other waters? If so, describe. <br /> There are currendy no drainage or water qualiry treatment systems on-site for <br /> stormwater runoff. Development of the site would include the construction of a <br /> two celled w•etpond detenrion system just north of the on-site wetland. A <br /> detention valume of 4,79'? cf. would pro�ide enough detention to meet the <br /> release standard. Run-off a�ould be treated for water qualiry prior to being <br /> released at similar pre<ievelupment rates in[o [tx wedand omsite. <br /> Environmenml Checklisr - Kaneris Cmm�: •rcial De��elupment Page 16 <br /> SHOCKEYIBRENT, in: <br />