Laserfiche WebLink
E�e�LllAl1U�\ tUK <br /> AGENCY USE ONLY <br /> b. Are there any off-site sources of emissions or odor that may aff�ct your <br /> proposal? If so, generally describe. <br /> Main off-site sources of emissions are from vehicles traveling along adjacent <br /> roadways. Air quality wichin the site vicinity is good and is expected to remain in <br /> that range. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if <br /> any: <br /> The Washington Clear Air Act requires the use uf all known, available, and <br /> reasonable means of controlling air pollution, including dust. Construction <br /> impaca would not be significant and could be controlled by measures such as <br /> washing truck wheels before exiting the site and maintaining gravel construction <br /> entrances. In addition, dirt driving surfaces would be watered during extended dry <br /> periods to control dust. These impacts are not expected to be significant. <br /> 3. WATER <br /> a. Surface: <br /> 1) Is there any surface water body on or in the immediat:; vicinity of the site <br /> (including }•ear-round and seasonal streams, saltwater, lakes, ponds, <br /> wetlands)'' If yes, describe type and provide names. If appropriate, state <br /> what stream or river it flows into. <br /> Yes. See submitted Wetland Analysis. The main body Silver Lake lies west of <br /> the site, across SR 527. A 0.30 acre Category III wedand is located on-site in <br /> the southwes[ern corner with an adjacent 50' buffer. Approximately 6,500 sf. <br /> consis�s of emergent and scrub scrub wetlands associa[ed with 6,500 sf. of an <br /> isolated open water portion of Silver Lake. The site has been significantly <br /> modified, in the past the pond is now separated from the lake by SR S27 and <br /> road fill. <br /> 2) VVill the project require any work over, in, or adjacent to (witLin 200 feet) <br /> the described waters? If yes, please describe and attach available plans. <br /> Yes. Approzimately the western half of the proposed development would occur <br /> within 200' of the Ordinary High Watcr Mark (O.H.W.M.) of Silver Lake or <br /> the associated Category III Wetland at ffie southwesc comer of the site. See <br /> Figure 3 — Aeliminary Site Plan and Preliminary Grading & Drainage Plan. <br /> 3) Estimate the amount of f�11 and dredge materia: :hat woWd be placed in or <br /> removed from surface water or weUands and indicate the area of the site <br /> that would be affected. Indicate the source of Fill material. <br /> No fill w�uld be placed in or removed f;�m the wedand on-site. �� <br /> Er�vironmenta! CheclJist - Kaneris Commercia( Devefopmrnt Page I� <br /> SHOCKEYIBR[YT. itz. <br />