Laserfiche WebLink
PERTEET ENGINEERIiNG iNc. <br /> Civil and Transportation Consultants �p06)252-7233 <br /> 2924 Colby Avenue Q <br /> Everett,WA 98201 • ; �' �� (A7� <br /> !.� � <br /> March 11, 1991 � 19'�� "� <br /> .....AR 1 <br /> ..... .. ... .. <br /> CITY pF�EVERETT..... <br /> Public yyorks pept <br /> Mr. Latty Crawford <br /> Assistant Duector of Public Works <br /> Ciry of Everett <br /> 3200 Cedaz �treet <br /> Everett, WA 98201 <br /> Re: Pacific Rim Restaurant <br /> Cost Sharing of Storm Arainage System <br /> Dear Larry: , <br /> As you know, when the City acquired part of Emory Cole's property on Silver Lake it was <br /> apparent that in order to meet City water quality standazds the storm drain system to be <br /> installed as part of the Pacific Rim Restaurant project would have to accommodate the future <br /> City park construction. Therefore, as part of the property acquisitien, the City agreed to shue <br /> in the costs of the storm drain system. This letter details the storm dra�n costs mcurred to <br /> date, and is a request on behalf of Mr. Cole for reimbursement of the City share of those <br /> costs. <br /> The attached site plan higlilights those slorm drain elements which have mutual benefit. The <br /> reimbursement request is for one-half of the mutual benefit costs. Please note that we have <br /> excluded the estimated cost of the site storm draiu elements that are not necessary to convey <br /> water from the park site, and that we have added an allowance for the labor'to install the <br /> oil/water separator. These costs are not shown on the contractor s bid nor were we able to <br /> obtain them from the contractor. However, we feel that our estimate is representative of the <br /> actual costs involved. <br /> GENERAL <br /> Attached is a segregation of costs identified as those wsts benePitting both Cole's property and <br /> the adjacent City of Everett property. The properties refetted to are locatecl between 19th <br /> Avenue S.E. (SR 527) and Silver Lake and between 116th Street S.E. and 120th Street S.E. <br /> The costs considered are those incurred by Emory Cole to perform the design engineering and <br /> actual construction of the storm drain and water quality facilrt�es at the site. Those costs were <br /> incurred in the time s an between A ril and November, 1990. The improvements were made <br /> in accordance with the plans prepared by Perteet Engineering and approved by tt�e Ci:y of <br /> Everett. . <br /> Further, the costs considered are from the invoices submitted for payment to Emory Cole <br /> except as noted in the beginning of this letter. For purpose of this report, those costs <br /> identified as benefitting both the property of Emory Cole and the City of Everett are referred <br /> to as mutual benefit costs. A tabulation of invoices and mutual benefit costs is shown ia Table <br /> 1. <br />