My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11830 19TH AVE SE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
11830
>
11830 19TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 1:41:42 PM
Creation date
4/2/2017 1:40:31 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Larry Crawford , <br /> Much 11, 1991 <br /> Page 2 <br /> TABLE 1 <br /> MUTUAL BENEFIT COSTS <br /> Mutual Benefit Cost <br /> % of City <br /> Total Total Share <br /> Vendor Billing Billing Amount (50%) <br /> Bill O'Brien & Sons Const. $55,839.94 ' <br /> Item 4 (SD) 30947 <br /> ► Less Adj. -3550 <br /> Item 12 _� <br /> Subtotal � 32397 <br /> P & O(15%) +4 <br /> Total 37257 67% $37,257.00 $18,629 <br /> Anderson Construction 3,476.55 6796 2,329.00 1,164 <br /> Van Den Akker Landscaping 981.55 100% 981.55 491 <br /> Oil/Water Separator <br /> Utility Vault Co 10,055.00 100% 10,055.00 5,027 <br /> Est. lnstallation Cost 4,025.00 100% 4,025.00 2,012 <br /> (equip. and labar) <br /> Clazk Leeman Surveying 3,961.50 <br /> Items Marked * 60% 2,383.50 1,192 <br /> Perteet Engineering 12,199.78 <br /> Storm Dr/Water Quality 45% 5,489.90 `1,745 <br /> -------------- ------------- ---------- <br /> TOTALS $90,539.32 69% $62,520.95 $31,260 <br /> ► orhon o�storm ra�n ac� ity not ene �ttmg �ty <br /> /�;<'T/,dL: <<7c:r'�i//"'--v��''c„J ��t� `�.T�T— ' <br /> VENDOR INVOICFS C'"�' � ��c, <br /> Anderson Construction / Bill O'Brien & Sons Construction <br /> -< <�F'.�c J�� <br /> Anderson Construction was the general contraclor for the construction of the project. O'Brien <br /> Construction was the subcontractor who performed the physical site work. From O'Brien's <br /> invoice the mutual benefit costs are itemized and readily �dentified. This amount was 67 <br /> percent of lheir total billing. We then used 67% of Anderson's billings as representative of <br /> their wsts to administer �!�e O'Brien contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.