My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12402 19TH AVE SE 2016-01-01 MF Import
>
Address Records
>
19TH AVE SE
>
12402
>
12402 19TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2017 2:06:18 PM
Creation date
4/2/2017 2:06:11 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12402
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r (_ <br /> PUBL/C WOIitK.'S <br /> June 12, 1997 <br /> Eugene Vrieling <br /> 11128 24th Avenue SE <br /> Everett, WA 98208 <br /> Subject: Owner: Vrieling <br /> Job Address: 12402 19th Avenue SE <br /> Plan Check No.: 53279 <br /> Dear Mr. Vrieling: <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only, additional revisions or additions may be required by other <br /> departments (such as Utilities, Planning or Fire). All references refer to the 1994 Umform Building <br /> Code, as amended by the State of Washington and/or Washin�con State Energy Code 1995 EcliUon, <br /> unless stated otherwise. <br /> In order for the prceessing of your application to continue, it will be necessary to <br /> provide the Bui�ding llivision with two copies of revisions retlecting necessary <br /> corrections. <br /> 1. Provide double joists under braced wall lines. <br /> 2. Provide minimum 1-3/8" solid core wood door with self closer between the house and <br /> garage. <br /> 3. Provide minimum 36" landing at all entrance/exits. Landing shall be not more than 8" <br /> below the finished floor. <br /> 4. Provide window size on all windows. <br /> 5. Provide size, species and grade of girder in crawl space. <br /> 6. Provide detail of intermediate support in crawl space. Detail connections. Provide <br /> positive connection capable of resisting uplift and lateral displacement. <br /> 7. Provide cross-section a[ cantilever (foundation to roo�. <br /> 8. Provide size species and gra�e of garage door header. <br /> 9. Show all hips, valleys and ridges on roof framing plan (may be shown on floor plan as <br /> long as clarity is maintained). Show roof framing at bay window. <br /> CITY OF EVERETT• 3200 Cedar Street • EveretL WA 98201 • (425) 257-8800• Fax(425) 25?-BBSP <br />
The URL can be used to link to this page
Your browser does not support the video tag.